Laserfiche WebLink
Site P,ddress: � <br />ELEGTRICAL <br />❑ Temp Service <br />❑ Groundwork <br />❑ SIablConduit <br />0 Rough In <br />❑ Service <br />❑ Grounaing <br />❑ Ceiling Grid <br />❑ Electrical Final <br />SITE WORK <br />❑ Footing drains <br />❑ Roof drains <br />OTHER OR CONSUL <br />INSPECTION REPORT <br />Date: Q��%' /� Pe!mit: � ��n'J ' ���_, <br />Coniractor: <br />Owner: ��D~-' �a'� <br />TYPE OF INSPECTION RE�UESTED <br />BUILDING MECHANICAL <br />❑ UFER ground ❑ GroundworWSlab <br />❑ Fooling ❑ Rough In <br />❑ Foundalion ❑ Ceiling Grid <br />❑ Slructural Slab ❑ OK to insulale <br />❑ Framing ❑ Rooftop Units <br />❑ Insulation ❑ Mechanical Final <br />❑ Crywall Nailing <br />❑ Shear Nailing GAS PIPE <br />❑ Roof Nailing ❑ Rough InlService <br />❑ Ceiling Grid ❑ Refrigeration <br />❑ Building Final ❑ Gas Pipe Ffnal <br />❑ APPROVAL ❑ PARTIALAP?ROVAL <br />❑ OK FOR T.C.O. ❑ CORRECTION RE�UESTED <br />❑ OK FOR C.O. ❑ VIOLATION <br />❑ UNAOLE TO PERFORM INSPECTION: <br />pL�G <br />❑ roundwork/Slab <br />�Roughln <br />Ceiling Grid <br />❑ OK to insulate <br />❑ Water Service <br />❑ Medical Gas <br />❑ Plumbing Final <br />Hot Water Tank <br />❑ Rough In <br />❑ HWT Final <br />FINAL APPROJAL TfiIS PERMIT <br />� <br />I—I r.nLL 14251 257-88E1 FOR REINSPECTION • 24 hour notice required <br />Inspector. ���V � Date: / `�� (( <br />EIR (4/09) "Sfl�^''r = ��aM�a r�nwonoro • us��ennm <br />