Laserfiche WebLink
� <br />` Bob Landles - Planning Department <br />,p K� ����-�� <br />" Public Works Department GE�'' <br />o"F July 17, 1979 <br />'""'"` S.E.P.A. CHECKLIST REVIEW !{126 <br />=�SAL <br />Tc place 1,500 cubic yards of fill on 48,000 square foot site east of Evergreen <br />Way, south of McGill, north of Intercity. (no building or structure involved) <br />RECOMMENDATIONS <br />It is the recummendation of the Public Works Department that issuance of a <br />Negative Declaration be subject to the following: <br />1. City streets are to be kept clear of dirt and debris during earth-moving operation. <br />2. During earth moving operation all truck traffic to and from the site within <br />the City of Everett shall be on arterial streets unless otherwise approved <br />by the Public Works Department. 7'ruck route to be approved by Public Works <br />prior to beglnning earxh moving operation. <br />3. Grading, drainage and erosion control plans are required prior to placing any <br />additional fill material on this site. <br />4. Hydro seeding wlthin 30 days of completion of operation for all exposed earth <br />withln 200 feet of stream ib required. <br />NOTE• <br />Any improvements to s:te shall require complete Evergreen Way standard street <br />improvements (attached). <br />_ , �:: .: <br />