My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
9424 EVERGREEN WAY 2018-01-02 MF Import
>
Address Records
>
EVERGREEN WAY
>
9424
>
9424 EVERGREEN WAY 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/3/2022 4:11:31 PM
Creation date
2/10/2017 2:20:56 PM
Metadata
Fields
Template:
Address Document
Street Name
EVERGREEN WAY
Street Number
9424
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
146
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r�J <br />August 21, 1998 <br />Brett Cowdell <br />Econo Lube N Tune <br />4911 Birch Street <br />Newport Beach, CA 92660 <br />Subject: Project: Econo Lube N Tune <br />Job Address: 9424 Evergreen Way <br />Plan Check No.: S 59864 (wall and pole sign) <br />Dear Mr. Cowdell• <br />In response to your application for a construction permit, your plans have been examined and you are <br />advised that the issuance of a permit is being withheld for the reasons listed below. These comments <br />address building issues cnly, additional revisions or additions may be required by other departments <br />(such as Utilities, Planning or Fire). All references refer to the 1997 Uniform Building Code, as <br />amended by the State of Washington and/or Washington State Energy Code 1997 Edition, unless stated <br />otherwise. <br />In order for the processing of your application to continue, it will be necessary to <br />provide the Building Division with two complete new sets of drawings reflecting the <br />corrections requested. <br />1. The structural calculations, details and construction notes for the pole sign are required for <br />review. The plans should show all connections, materials, depth of imbedment and foundation <br />support. All plans and data shall be stamped by an engineer licensed by Washington State. <br />Prepare a response letter showing where each item in this correction letter is addressed on the plan set. <br />Upon resubmittal of the drawings, your application will be given priority and plan review will <br />recommence. <br />All required submittals shall be of sufficient detail and contain sufficient information to ensure that the <br />proposed structure will be constructed in compliance with all adopted codes. <br />Sincerely, <br />ony Lee <br />Associate Engineer <br />TL.IWd djugplck 71 <br />CITY OF EVERETT• 3200 Cedar Street 9 Everett. WA 98201 • (425) 257-8800 • Fax (425) 257-8856 <br />
The URL can be used to link to this page
Your browser does not support the video tag.