My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
9501 EVERGREEN WAY 2016-01-01 MF Import
>
Address Records
>
EVERGREEN WAY
>
9501
>
9501 EVERGREEN WAY 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/19/2017 12:01:02 PM
Creation date
2/10/2017 2:21:28 PM
Metadata
Fields
Template:
Address Document
Street Name
EVERGREEN WAY
Street Number
9501
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
66
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� <br />SLIDES'FOR PIGNATARO COUNCIL AGENDA ZTEM <br />� � <br />SEcT�o�t� <br />l. Shows Evergreen Way at intersection of Interosed Pignataro Used <br />Cleared site in center of picture is prop <br />Car Lot. <br />2. City Map; shows relationship of Intercity *o Evergr.een Way and <br />South Broadway <br />a. Shows potential for future thru access to Hardeson <br />b, Shows distance on South Broadway from Emander to <br />Intercity to 7th <br />Series of Slides Showinq Improvements on E� r9reen <br />3. 47th & Evergreen; an Apartment Complex on 47� sidewalknupltosana Yt el <br />and sidewa�oximately 50tfeet on Evergreennging <br />corner app <br />4 <br />5. <br />(Al1 the cars shown in Pix �re parked on City property without per�lt. <br />p sidewalk will be constructed in this location). <br />Same corner; the extreme east corner of Apartment Complex is in lower <br />left hand corner. All the remaining street aandsaroundreornerton <br />ypproximately 80 feet extending from here up <br />Evergreen, are being installed by Developer. <br />Shows Humphrey VN1 Used Car Lot and approximate lo�ation of newJ*T�e�section <br />of Highway Place ':o be constructed alonq with curbs� gutters� <br />improvements and sidewalks cn Evergreen Way. <br />Highway Place will have sidewalks, curbs and gutters installed back to the <br />existing Highway Place configuration. <br />6. Shows 2 connected improvement� <br />7. <br />C� <br />(a) One built by A1's Auto Por ne�a service station <br />(b) The other built for Everett Suzuki <br />This is the new Frontier Bank where S/Wsr curbs� gutters� and street <br />improvements will be installed. ,��,;�a4,'i� <br />This is Wendy's, South of 75th Street, immediately south of 03-pmPic Bank,�on <br />west side of Evergreen. <br />9, On the other side of �vergreen from Wendy's; Cascade Shopping Center will <br />be constructing 40� feet of new street, sidewalks,�urb and gutter, and <br />new signal on Evergreen� 600 feet of new street and sidewalk on 75th Street; <br />approximately 1500 feet of off-site walkways on 75th�and a� new street <br />including sidewalks called 77th. <br />10. This is the Fred Meyer Complex which included curbs� gut-ters, sidewalks, <br />and street improvfinents both to �vergreen Way and to Casino Road. <br />11. This is Mr. Steak� south of Fre9 Meyer, showing new sidewalks. <br />
The URL can be used to link to this page
Your browser does not support the video tag.