|
To I3oy f.andles, Plannin� Deoartment
<br />FPOM Yuhlic'Vor!cs Department�/�
<br />DATE pctoher 5, 193! � �
<br />�'
<br />SUBJEGT S.ErP�A. Cherklist Review IIQL-S�: S.[�,U. ii IDITV OF EVERETT, EVERETT WASHINGTON
<br />P20POSAL:
<br />Issuance of an S.P.U. for construction of Firc Station ll6.
<br />RGCONI�AENDATIONS
<br />It is the �ecommendation of the Puhtic �Vor!cs Department that issuance of a Nee+tive
<br />Declaration bc subject to the following:
<br />2.
<br />3.
<br />Detailed dra�vings shall be submitted to L'�e Public 1Yorks nepartment sho�� i�n
<br />parl<in� layout, landscapinq, utilitics, storm drainagr, temporary constructiun
<br />erosion rontrol and all required improvements in the pu�lic right-of-wav.
<br />Public Works Department approval of thes� dra���ings is required prior to
<br />any permits being issued.
<br />Right of Nay ImprovemeMs are to be made by the proposed Lor.al lmprovement
<br />nistricts, Cvergrecn `3l aY 1982, Emander Road 1983. in the event the L.I.D.
<br />fails, thc City will provide similar irnprovements abuttin� their property.
<br />As-huilts of storm se•.ver, sanitary sewer and water svstems will 6e rcqui� r'
<br />to be submitted.
<br />r+, Citv streets and alteys are to be kept clear of dirt and dehris at all ti�
<br />ciuring construction. Dust suppression and street cleaning must occur
<br />directed by the Puhiic :Vorks Inspector. During construction, all truc'
<br />to and from the site within the City of Everett shall be on arierial str
<br />unless othenvise approved b� the Puhlic `Vorks Department.
<br />�,,
<br />,�articipation in the cost to fun� the South End InterceQtor is require�'.
<br />approximate cost based on the prelimina-y information provided is t''_ :
<br />$2213 X otfice sq. ft., as of Octoher 5, 1931. The ar_tual cost shall be con:�, .t '
<br />by the liuildinp, flepartment per the ordinance in effect at the tirne and ar_c:•,n�� �-,
<br />to the information provided on the aoproved plans on tFe date of permit iss�.r,; ,c .
<br />6. ❑rainage caiculations must he suhmitted. If the calcs,
<br />Engineering Department, indicate a need for 250 cu. ft.
<br />un-site dete�tion �vill not be required. If mo�c then "'S
<br />is neected, there will be an option of making a paym � �:
<br />capital improvement fund in lieu of on-site detentin��.
<br />after revie�•v by thc
<br />Of StQ��3�� OYI�SS.
<br />� . ,�, �,, ,,; �t;r�,,.
<br />r.�, ::�..-.. .. :-i�r,. t�,c
<br />7, All exposed ground must be reseed^d within 30 dnYs ,"; ��=.-c ��. ��''! ��'�
<br />road constru�tion. if huildinp, activitv commences ��ithin 30 �'a", r,: t^r ��",�����'��'��'
<br />of road construction, reseedinp, will not be required. lf resecdinr is no* aractic:il
<br />due to weather or s�aso�al �roblems, !he ground will be covcr��i
<br />as directed by the ity ng ne^r.
<br />�\�,;-�ri'�i
<br />
|