My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
9520 EVERGREEN WAY 2016-01-01 MF Import
>
Address Records
>
EVERGREEN WAY
>
9520
>
9520 EVERGREEN WAY 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/19/2017 11:38:34 AM
Creation date
2/10/2017 2:26:25 PM
Metadata
Fields
Template:
Address Document
Street Name
EVERGREEN WAY
Street Number
9520
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
219
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
: ao.�i <br />DATE <br />SU9JECT <br />Bob Lancles, Planning Depar,men: <br />Public'Vorks Deoartment, � /,� <br />_� : <br />October 5, 19S 1 � <br />S.E.P.A. Checklist Review //S1-.`u S.P.U. 1i1��T� aF =vea=_--, =_veae-T ;�asHi,v�To.v <br />PROPOSAL: <br />Issuance of an S.P.U. :or construction of Fire Station 1P6. <br />RECOMMENDATIONS <br />It is the recommendation of the Public Works Depar�ment that issuance of a Vegative <br />Declaration be subject to the following: <br />l. Detailed drawings shall be submitted to the Public Works Department showing <br />parking layout, landscaping, utilities, storm drainage, temporary construction <br />erosion control and all required improvements in the public right-of-way. <br />Public Works Department approval of these drawings is required prior to <br />any permits being issued. <br />2. Right of Way Improvements are to be made by the proposed Local Improvement <br />Districts, Evergreen Way 1932, Emander Road 1953. In the event the L.I.D. <br />fails, the City will provide similar imorovements abutting their prooerty. <br />3. As-builts of storm sewer, sanitary sewer and water systems will be required <br />to be submitted. <br />4. City streets and alleys are to be kept clear of dirt and debris at ali times <br />during construciion. Dust suppression and street cleaning must occur as <br />directed by the Public Works Inspector. During construction, all truck traffic <br />to and from the site within the City of Everett sh�l be on arterial streets <br />unless otherwise approved by the Public `S�orks Department. <br />5. Participation in the cost to fund the South End Interceptor is required. The <br />approximate cost based on the preliminary information provided is $67S + <br />$0.213 X office sq. ft., as of October 5, 1931. The actual cost shall be computed <br />by the Building Department per the ordinance in effect at the time and according <br />to the information provided on the approved plans on the date of permit issuance. <br />6. Drainage calculations must be submitted. If the calcs, after review by the <br />Engineering Department, indicate a need for 250 cu. ft. of storage or less, <br />on-site detention will not be required. If more than 250 cu. ft. of storage <br />is needed, there will be an option of making a payment to the City's drainage <br />capita! improvement fund in lieu of on-site detention. <br />7. All exposed ground must be reseeded within 30 days of the comoletion of <br />road construction. If building activity commences within 30 days of the completion <br />of road construction, reseeding will not be required. If reseeding is not practical <br />due.to wea�t�ier r s�dso�al �roblems, the ground will be covered <br />as directe y t�ie ity ng neer. <br />RAG:mh <br />�z������Y b <br />
The URL can be used to link to this page
Your browser does not support the video tag.