My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
9520 EVERGREEN WAY 2016-01-01 MF Import
>
Address Records
>
EVERGREEN WAY
>
9520
>
9520 EVERGREEN WAY 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/19/2017 11:38:34 AM
Creation date
2/10/2017 2:26:25 PM
Metadata
Fields
Template:
Address Document
Street Name
EVERGREEN WAY
Street Number
9520
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
219
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
To File <br />'flOM <br />DATE <br />SUBJF.CT <br />^1 } ='.i <br />p <br />a''��u.TWI ei..F«. <br />Jce Kozlovski � <br />L.J <br />February 5, 1982 <br />PIY�A1L1tillCtlOi1 M�CiIII� <br />�j / <br />�.s.�, �,.��„ �,�G�, <br />; , ;���J �� <br />, <br />� <br />��,�=j�� c <br />����C��� <br />CITV OF EVERETT, EVERETT WASRM�TO� <br />1982' . <br />............._._..... . <br />..........+..� <br />,� .............. FVERETT, ' <br />CI7Y OF - <br />public Waks �epL <br />Pre-Construction Meeting croncerning Fire Station /16 was held 2/4/82 (see attached <br />at Cendance sheet). <br />Gene Lilly is Cobra's Office Project Supervisor. The 7ob Foreman has not yet been <br />appointed. His name will be sent by Cobra to Gary Parkinson, along with a list of <br />subs and the construction schedule, by the 15th of February. <br />Jce Koz indicated that the City's contacts to Cobra will be made through the <br />Architect's office, and that all official actions and requests for payment will be <br />deared by the Architect. <br />City inspections within the right-of-way will be made by Ruben Gonzales, of the <br />Public Works Service Inspection, and the building permits within the property will <br />be through the Permits and Inspection Division. All requests for inspections will be <br />cleared through that office as standard procedure. <br />John Patzold reviewed the items necessary for contract compliance. The <br />contracta will follow the Davis-Bacon Act and provide weekly payrolls with, <br />perhaps, one on-the-job inspection by Patzold during the construction. The <br />contractor is expected to comply with the two EEO sections that the City has <br />written to the specifications. �ohn will send copies of both forms to Gene Lilly. <br />Richard Hunt, representing the electrical �nion local, requested the name of the <br />sub. Mr. Lilly indicated that he has not yet been chosen. Mr. Hunt expressed <br />concern that the electrical contractor should be union and have an agreement with <br />the locai union organization. He warned against contracior� shopping for bids at <br />this stage of the game. <br />Mr. Lilly requested 30 sets of plans. These will be provided to him by the City <br />whenever the drawings are changed to reflect the change order which Joe Koz will <br />present to Council later this month. <br />Because of the basic changes anticipated in the change order, the contractor <br />requests that the start-up date not be on the 8th, but on February lSth. The <br />Architect and Jce Koz agreed with lhis request and the letter of authorization to <br />proceed with the job will be retyped to reflect this date chang�e. <br />Jce Koz indicated that there is a specitic procedure within the City for processing <br />payment requests. That schedule will be sent to Cobra along with the new letter to <br />proceed. <br />Dennis Gableman indicated that the setting of grades for work within Evergreen <br />Way are on the drawings and •that the con:ractor is expected to provide his own <br />survey based on existing Evergreen Way benchmarks. Ruben Gonzales will verify <br />the forms based on these benclimark elevations. Dennis further indicated that the <br />City's revised engineering standards allow for PVC sewage pipe for a side sewer <br />connection. <br />Gene Lilly will set up a regular on-site meeting date for review of the project work <br />progress.. _ <br />
The URL can be used to link to this page
Your browser does not support the video tag.