Laserfiche WebLink
Site Address: <br />ELECTRICAL <br />❑ Temp Service <br />❑ Groundwork <br />Q SIablConduit <br />❑ Roughln <br />❑ Service <br />❑ Grounding <br />❑ Ceiling Grid <br />Q£�ctrical Final <br />SITE WORK <br />�] Footing drains <br />❑ Roof drains <br />INSPECTION REPORT <br />Date: � /2 // Permit: �I ��0�—Q �� <br />Contractor: <br />Uwner: <br />TYPE OF I� <br />BUILDING <br />❑ UfER ground <br />❑ Fooling <br />❑ Foundalion <br />❑ SlrucWral Slab <br />❑ Framing <br />❑ Insula�ion <br />❑ Drywall Nailing <br />❑ Shear Nailing <br />❑ Roof Nailing <br />❑ Ceiling Grid <br />❑ Building Final <br />OTHEft )R CONSULTATION: <br />MECHANICAL <br />� Groundwork/Slab <br />❑ Rough In <br />❑ Ceiling Grid <br />❑ OK �o insulate <br />❑ Rooftop Unils <br />❑ Mechaniaal Final <br />GAS PIPE <br />❑ Rough In/Service <br />❑ Refrigeration <br />❑ Gas Pipe Final <br />❑ APPROVAL ❑ PARTIALAPPROVAL <br />❑ OK FOR T.C.O. ❑ CORRECTION REQUCSTED <br />❑ OK FOR C.O. ❑ VIOLATION <br />❑ UNABLE TO PERFORM INSPECTION: <br />❑ CALL (425) 257•8881 FOR REINSPECTION -24 hour notice <br />Inspector: <br />EIR (4I09) <br />PLUMBING <br />❑ Groundwork/Slab <br />❑ Rough In <br />❑ Ceiling Grid <br />❑ OK to insula�e <br />❑ Waler Scrvice <br />❑ Medical Gas <br />❑ Plumbing Final <br />4ot Water Tank <br />� Rough In <br />❑ HWT Final <br />FINAL APPROVAL <br />Date: <br />runMouaro • �zvun.nwa <br />