My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
9605 EVERGREEN WAY PACIFIC NORTHWEST IMPORTS 2018-01-02 MF Import
>
Address Records
>
EVERGREEN WAY
>
9605
>
PACIFIC NORTHWEST IMPORTS
>
9605 EVERGREEN WAY PACIFIC NORTHWEST IMPORTS 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/4/2022 8:20:23 AM
Creation date
2/10/2017 2:32:19 PM
Metadata
Fields
Template:
Address Document
Street Name
EVERGREEN WAY
Street Number
9605
Tenant Name
PACIFIC NORTHWEST IMPORTS
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
149
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ENG/VEER/NG / PUBA:/C SERVICES VEPARMENT <br />February 6, 2008 <br />FILE Copy <br />Pacific Market <br />9605 Evergreen Way Ste A <br />Everett WA 98201 <br />RE: STATUS OF YOUR CITY OF EVERETT PERMIT <br />Job Address: 9605 Evergreen Way Suite A (Pacific Market) <br />Permit: E0703-009 (200 amp subpanel replacement) <br />(Please reference both permit number and address when calling or writing) <br />According to our records there has been no request for inspection of work under this permit. We <br />would appreciate your assistance in clarifying the status of this permit. If you have decided not to do <br />this project at this time, please let us know so we can clear the record. The Everett Building Code <br />states that all permits expire if the work authorized by the permits is suspended or abandoned for a <br />period of 180 days atier the work is commenced. Work under this permit will no longer be authorized <br />unless you: <br />1) Demonstrate continuing progress by requesting inspection of work that has occurred since your last <br />inspection, or <br />2) Request final inspections of the work that is completed, or <br />3) Submit a written request for a 180 day extension, detailing justifiable cause for extension. <br />Please respond within 10 days. After that time your permit file will be sent to our Records Department <br />for microfilming without documentation of final approval. These records are available to prospective <br />buyers and lending institutions. If you wish to resume work in the future, a new permit must be <br />obtained. To schedule inspections, or to discuss the status of your permit file, please call me at (425) <br />257-7261 between 9 a.m. and 4 p.m., or contact me by e-mail at mmcleod@ci.everett.wa.us. <br />Sincerely, n^ <br />Margaret McLeod <br />Building Division <br />cc: Allstate Electric <br />4917 Evergreen Way #512 <br />Everett WA 98203 <br />CITY OF EVERETT • 3200 Cedar street • Everett, WA 98201 • (425) 257-8800 • Fax (425) 257-8856 <br />
The URL can be used to link to this page
Your browser does not support the video tag.