My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
9629 EVERGREEN WAY TIENDA CHAPALA 2016-01-01 MF Import
>
Address Records
>
EVERGREEN WAY
>
9629
>
TIENDA CHAPALA
>
9629 EVERGREEN WAY TIENDA CHAPALA 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/19/2017 11:07:37 AM
Creation date
2/10/2017 2:36:52 PM
Metadata
Fields
Template:
Address Document
Street Name
EVERGREEN WAY
Street Number
9629
Tenant Name
TIENDA CHAPALA
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
114
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
�� � .� ,� � � ,�� - _ � <br />1 <br />12404 E Gibson Rd. A302 <br />PROPOSAL SUBMIITED TO: <br />Name: Tienda Chapala Inc. (Alfaro �k Lizbeth) <br />Address: 9629 Evergreen Way #203 <br />City/$tate: Everett, WA 9fi204 <br />Phune No.: (425) 355-7334 <br />Everett �WA 98204 <br />(425)345-6130 <br />WORK TO BE PERFORMED AT: <br />Addr¢ss:9629 Evergreen Way #203 <br />City/$tate: Everett , WA 98204 <br />Date of Plans: To be scheduled... <br />Fax No.:355-5171 <br />We hereby propose to furnish th�: materials and the labor ner.asary for the comp�etion of... <br />Propoul No.:01074 <br />Date: 06 /15/00 <br />Contractor: Nathan Lane <br />Expanding the store into #204 <br />1.Cutting a new entry in between #203 and #204, rerouting existing electrical to accommodate new entry (two possible wires will need rerouted). <br />2."If support beams are compromised three new structural beams will be added at a additional cost of $160.00 . <br />3. Approximately 16' of wall is to be deniolished in #204, a sink and cabinet will be removed, a new plywood cabinet will <br />be built around the hot water heater, two drains are to be installed in the 800r and also two sinks are to be installed and <br />plumbed to the new and existing plumbing. <br />4. A drywall patch of the affected areas, moulding for the entry, all standard plumbing materials, removal and disposal of all <br />pertaining debris <br />5. Removal and disposal of existing carpet, surface svaping to accomidate tiles,'buffer may be needed to meet correct surface needs 1or tile. <br />$ubtotal ................................................................................................................................................................. S 2160.00 <br />WAState Sa!es Tax @ 6.6% ....................................................................................................................................5185.76 <br />Tota1.....................................................................................................................................................................523 45.76 <br />NI Material is guamnteed ro be as specified, and the abcve work to be performed in acmrdance with the drawings and specifications submitted for above <br />vrork and campleted in a substantial workmanlike manner for :he sum of: <br />Two Thousand Three Hundred Forty Five Dollars and 76/CO Cents.., <br />With Payments to be as follows: 1/2 Upon acceptance of estimat.: proposal, 1/4 to be paid upon completion of job <br />Note: This Estimate Proposal may be withdrawn by us if not eztepced within 30 days. <br />We appreciate your business, and look forward to working with you soon. Custcmer satislaction Guaranteed. <br />i,,,,..u�.�.> a«�� �,.co.. �oa+�.�. Md.:�, <br />mn ca� a 4..Mnd a+.w�..m� adv,.�d,a e�. <br />�.�.v�dwnwvud o�e� wua. M�sR^Y�n <br />wri9m ym iuJo.. cdf' n, w.�n bn�d w awd. r �, p� V V <br />Signature � Date `E� I 1 . <br />
The URL can be used to link to this page
Your browser does not support the video tag.