Laserfiche WebLink
F <br />E�rIt <br />aycn <br />Haa <br />•. <br />K y <br />everett INSPECTION REPORT <br />� H'4 <br />x z3 <br />Address <br />y t7 <br />Contractor E T err, <br />o <br />WOE <br />� <br />cc).m 0 <br />,, I,� Owner r <br />IM <br />Hz <br />Date <br />to <br />Hy <br />TYPE OF INSPECTION REQUESTED <br />g <br />qqti <br />t�1 <br />�LDG: Pml. No. .23V lv 7 ❑ MECH: Pmt. No. <br />� <br />y C <br />❑ Et -EC: Pmt. No. ❑ PLBG: Pmt. No. <br />❑ Temp. Elect. ❑ Framing ❑ Gas Piping <br />❑ Footing ❑ Drywall, Nailing ❑ Consultation <br />❑ Foundation ❑ Shear Nailing ❑ Groundwork <br />❑ Ductwork ❑ Grid ❑ Struct. Slab <br />❑ Wood Stove ❑ Rough -In I9-Final <br />❑ Masonry ❑ Service ❑ <br />�-- --� <br />❑ APPROVAL ❑ P IAL APPROVAL <br />---�- <br />❑ VIOLATION Vf,60RRECTION REQUIRED <br />❑Corrections listed below MUST BE MADE before work can be approved. <br />.. <br />❑ Please contact inspector and arrange for appointment. <br />¢� <br />❑ Was not able to perform inspection. <br />❑ CALL 259-8810 FOR REINSPECTION — 24 hour notice required. <br />A CERTIFICATE OF OCCUPANCY SHALL BE ISSUED AND POSTED ON <br />THE PREMISES PRII J TO OCCUPANCY. <br />� CPn r <br />Inspector <br />�t <br />