Laserfiche WebLink
. 'D�T[Nf ��;�� o . ,; <br />, CLOSED CM WORR ORDERS REPORT <br />Total Utility Maintenance Management System <br />04/22/1997 Page 2 <br />-------------------------------------------------------------------------------- <br />Date Range :O1/09/1989 - 04/O1/1997 <br />CM Work Order Range :1001091070001 - 7401196770910Pattern :7101196649135 <br />Item Range :<Blank> - WVL3694L05 Pattern :* <br />Program ALL Function ALL Activity ALL <br />-------------------------------------------------------------------------------- <br />CM WORK ORDER ID: 7101196649135 (continued) <br />N/A CONCRETE (ASSOC) 04 10 1997 1 117.51 <br />PIPE46055047 PIPE 8" TYTON JOINT DI 03/31 33 315.15 <br />SLEE50061947 SLEEVE TAP 12" W/8" TAP STLS 03/31/1997 1 324.95 <br />SUPP46146147 SUPPORT PIPE 8" 03/31/1997 2 119.66 <br />VALV46043048 VALVE GATE 8" MJ X FLANGE 03/31/1997 1 306.55 <br />VALV46117248 VALVE 8" DOUBLE CHECK DETECTOR 03/31/1997 1 2641.16 <br />Vehicles: <br />ID <br />V0017 <br />V0035 <br />V2044 <br />V2112 <br />V2119 <br />V27.37 <br />V2139 <br />V�!156 <br />V2�25 <br />V2227 <br />V3200 <br />V3508 <br />V6401 <br />VJ0005 <br />VJ0017 <br />VJ0021 <br />Description <br />94 FORD AEROSTAR VAN <br />'96 FORD 1/2T. 4WD <br />88 GMC S15 <br />91 CHEV 1 TON <br />91 CHEV 5 YD <br />84 GMC BOOM TRUCK 5 TON <br />86 CHEV 1-TON W/HYD. UNIT <br />89 DODGE 1 TON <br />88 FORD 8YD <br />SE3 FORD 8YD <br />80 CASE VIBROMAX W25 ROLLER <br />88 ^ASE BACKHOE 4X4 <br />80 CASE FLATBED TRAILER <br />'95 FORU 1.5 YARD <br />'96 FORD 5 YARD <br />�96 FORD DUMP 10 YARD <br />Total Material Cost: <br />Hours_ <br />6.00 <br />1.00 <br />2.00 <br />2.00 <br />8.00 <br />14.00 <br />2.00 <br />18.00 <br />2.00 <br />2.00 <br />2.00 <br />14.00 <br />2.00 <br />2.00 <br />6.00 <br />4.00 <br />Cost <br />34.80 <br />5.90 <br />10.00 <br />10.62 <br />86.40 <br />296.80 <br />9.60 <br />91.80 <br />30.72 <br />30.72 <br />39.44 <br />232.40 <br />0.00 <br />19.40 <br />88.50 <br />90.40 <br />Total Vehicle Cost: 1077.50 <br />Work Description: <br />------------------------------------- <br />COST EST. - EXPOSE 12" MAIN� MAKE 8" <br />CONTRACTOR INSTALLED VAULT, 8" DCDA, <br />SIDEWALK. CONTR. TO FURNISH/INASTALL <br />REF. 710-119-664-9134 - 1" <br />METER# 41511213 <br />HOT TAP, INSTALL 50+ 8" <br />RESTORE AREA AND PATCH <br />VAULT <br />4 alv0 7fi <br />�oaa • a7 <br />PIPE THROUGH <br />STREET AND <br />THIS WC IS A CARRY OVF.R FROM 1996. NO INVENTOFY MATERIAL TO JOURNALIZE FOR <br />1996. <br />Total cost for work order 7101196649135: <br />7556.00 <br />�EP15'FEAL RECOFiDS <br />