My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
9800 EVERGREEN WAY 2018-01-02 MF Import
>
Address Records
>
EVERGREEN WAY
>
9800
>
9800 EVERGREEN WAY 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/4/2022 8:58:32 AM
Creation date
2/10/2017 2:45:46 PM
Metadata
Fields
Template:
Address Document
Street Name
EVERGREEN WAY
Street Number
9800
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
77
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Requested by <br />Charge Cost to (Name) <br />Address <br />Crawford <br />Fund Utility ACC <br />PUBLIC WORKS DEPARTMENT <br />UTILITIES DIVISION <br />3200 CEDAR STREET <br />EVERETT, WASHINGTON <br />COST ESTIMATE SHEET <br />of Request <br />zip <br />9-4-85 <br />Program W.O. N Assigned <br />Installation Location 9800 Evergreen Way <br />Installation type/description/size/etc. Move fire hydrant behind proposed new side <br />walk at existing location. (Kegal & Associates Building) <br />Total Estimated Cost 5805.00 <br />This estimate reflects the Utilities Division having to Saw cut .............. <br />provide labor, equipment and materials to complete the Shoring ..............X <br />above mentioned installation including, but not limited Excavation ........... X <br />to, the items identified to the right. Any labor and/or Backfill .............X <br />equipment provided by the contractor to facilitate the Compaction ...........X <br />work by the City water department will be reflected in Temporary Patch ......X <br />a refund to the person making the deposit. Permanent Patch ......X <br />Furnish double check valve assembly for <br />temporary water supply ................ <br />Final hook-up after purity and <br />pressure testing ............ <br />(Whenever the estimated cost is not sufficient to cover the total expense for labor, <br />material, equipment rental and administrative costs, the deficit shall be charged to <br />the property for which such installation was made and the owner thereof, and provided <br />further, that any excess payment shall be returned to the person applying for the <br />installation.) <br />Itemized Cost Estimate: Labor F, Overhead 414.00 <br />I(V/n/ <br />o 7/,( & 259-8821 <br />Material 199.00 Estimate Prepared By Phone N <br />Equipment Rental 92.88 <br />Don Wahl <br />Surface Restoration 100.00 cc: Larry Callahan <br />TOTAL ESTIMATE 805.00 Don Weitkamp <br />Larry Crawford <br />Bob Chervenell <br />Bud Krom 7� <br />SSP 05 1°85 <br />...... <br />CITY OF EVERt fT <br />P::L:ic l";orks pept. ��GQ� l <br />z <br />0 <br />m <br />
The URL can be used to link to this page
Your browser does not support the video tag.