My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
9930 EVERGREEN WAY US NAVY 2016-01-01 MF Import
>
Address Records
>
EVERGREEN WAY
>
9930
>
US NAVY
>
9930 EVERGREEN WAY US NAVY 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/19/2017 9:17:15 AM
Creation date
2/10/2017 3:02:33 PM
Metadata
Fields
Template:
Address Document
Street Name
EVERGREEN WAY
Street Number
9930
Tenant Name
US NAVY
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
45
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� <br />August 10, 1995 <br />Mr. Jeffrey S. McFall <br />City of Everett <br />3200 Cedar Street <br />Everett, Washington 98210 <br />. <br />.v. <br />J s x <br />PROPERTIES, INC. <br />Re: 9930 Evergreen Way Building "A" <br />Plan Check No. B-49126 <br />Dear Mr. McFall, <br />� <br />This Letter is written in response to your letter dated August 7th requesting corrections <br />and/or additional information in regards to the tenant improvement drawings submitted <br />for GSA at the Everett Business Pazk. I have reiterated your questions below as well at <br />the appropriate responses. <br />2. All buildings and additional or alterations to buildings over 4,000 squaze <br />feet of construction area require the plans and specifications to be <br />prepared by an architect currently licensed to practice in the State of <br />Washington. RCW 18.08. <br />Response: Piease refer to architectural stamp provided on all sheets. <br />3. Provide a smooth, hard, nonabsorbent surface on floors and walls of toilet <br />rooms per Section 510(b). <br />Response: See note added to Finish Schedule Sheet A-1 and Sheet A-2. <br />4. When showers are provided, at least one shower shall be accessible. Sec. <br />1105.2.1. <br />Response: See enlarged plan on revised Sheet A-2. <br />I hope this answers the request you made for additional information and clazifications. If <br />there are any additional questions please don't hesitate to call my office. <br />�incerely� <br />0 ���Qi�� D <br />Thomas J. Gollatz � <br />ocr � 31as5 <br />Project Manager <br />CITY OF EVERETT <br />Bldg. Permit Counter <br />100i �lndorcr Park Cast 'I'uk�cila. \C';ishington 98156 (?OG) ii�-8500 FAX (206) 57i-Si?i <br />
The URL can be used to link to this page
Your browser does not support the video tag.