Laserfiche WebLink
i <br />CLOSED CM WORK ORDERS REPORT <br />Total Utility Maintenance Management System Page 1-- <br />Date Range 01/09/1989 - 01/01/1998 <br />CM Work Order Range :0810800810000 - UT2830-30-322pattern :ern 7101196751309 <br />CM <br />Item Range :<Blank> - WVL3694L05 <br />Program ALL Function ALL Activity ALL <br />CM WORK ORDER ID: 7101196751309 Title: <br /><<DUPLICATE PRINTING OF THIS WORK ORDER>> <br />Item ID: NS0585EO36 -- WATER SERVICE <br />Location ID: <br />Program 710 Function 119 <br />Date completed: 12/18/1997 <br />CONVERT 2020 FAIRFAX AVE <br />Activity 675 <br />O-.,erall craft: Issued by: WMW Assigned to: <br />Issued: 12/01/1997 Travel Time: 0.00 Hr. <br />Out of Service? NO Priority: <br />Meter Reading: <br />Downtime: 0 hours <br />Status: <br />Labor: <br />Planned Hrs Actual Hrs <br />Cost <br />Craft ID <br />Name <br />--------- ---- -------------------------- <br />---------- <br />----""" <br />2.00 <br />28.26 <br />_ __ __ <br />UL CSG <br />CAVANAH, SHANE G. <br />0.00 <br />0.00 <br />2.00 <br />42.46 <br />WST WDT <br />WALDEN, DAROLD T. <br />---------- <br />Total Labor <br />Cost: <br />70.72 <br />Materials: <br />Date M <br />Used <br />Cost <br />Description <br />---- <br />-------- <br />______ <br />ADAP34000147 <br />___ <br />ADAPTER 3/4" MIP X IPS RI @ <br />12/17/1997 <br />12/17/1997 <br />1 <br />3 <br />2.50 <br />25.29 <br />25.29 <br />ADAP34000147 <br />ADAPTER 3/4" HIP X INSTA-TITE@ <br />METER CONC W/STEEL LID <br />12/17/1997 <br />1 <br />1 <br />1.36 <br />BOXo00065547 <br />BOX A <br />ELL 3/4" 90 DEG BRASS <br />12/17/1997 <br />1 <br />30.67 <br />ELL034101447 <br />METE36089447 <br />METER 5/8" X 3/4" NEPTUNE T-10 <br />12/17/1997 <br />1 <br />0.19 <br />PIPE34060647 <br />PIPE 3/4" POLY I.P.S. <br />X 3/4" (H12") <br />12/17/1997 <br />1 <br />52.31 <br />SETT34033647 <br />SETTER COP 5/8" <br />---------- <br />Total Material <br />Cost: <br />157.26 <br />Vehicles: <br />Description <br />Hours_ ___-__---- <br />Cost <br />ID <br />__ _ ---- <br />-------- ---------------------- <br />91 CHEV 1-TON HYD UNIT <br />_____ <br />2.00 <br />10.60 <br />-____-- <br />V2117 <br />Total Vehicle Cost: <br />10.60 <br />Work Description: <br />METER #41908477 <br />Total cost for work order 7101196751309: <br />--_-238.58 <br />