Laserfiche WebLink
SUMMIT ENVIRUSULU11UNb cuo �o uu�. •+++ <br />PAGE: 1 or3 <br />17 a''j lr <br />E: February . 1995 U <br />POLICY: 130BY 1 �� <br />CANCELS: NEW <br />r� pew ._........... <br />APPROVED BY:� �. <br />POL 1308 Permit Eamptions For Remedial Actions•Under MICA <br />lemmas RCW 70.105D.090 Remedial Actions—Fxempaon$ from <br />This policy imp conducted under the Model <br />1. <br />pr�urzi requirements, Whtca exempt Remedial Actions <br />To:dcs Control Act finm the P r'tl requireaiertts of specified state mvirpnttuntal permits and local government Per t'. The intent of the maemption is to expect P <br />ofcow sites. <br />The exepmption applies to persons conducting a remedial action at a facility under a <br />consent decree, order, or aY,°°d ordez; and the dapartmmu when it conducts a remedial <br />action. Such actions are exempt iiom the procedural requ en mis of chapters 70.94 <br />70-105 [Hxm does WasmJ, 7-5.20 [Hydraulic Permit]; 90.48 <br />C�],•70.9s [Solid waste], [WSW Qr�ts'], rraand 90.59 [SbcmJmds]RCW,and b pro ed �s� of any <br />, <br />laws requiring or authorizing local government p t <br />action. This exemption does not apply to independent actions. <br />department sham malrre compliance with the substantive provisions of chapters 70.94, <br />The laws <br />70.95, 70.105, 75.20, 90A8, and 90.58 RCW, and the subs <br />recluiring or authorizing local govermnmt pemuts or approvals. <br />final will <br />decision regarding ivIdel I substantive provisions are applicable. The <br />substantive re4uuea'mcs vat be iruorpora%d into the order or deand, as lies a actions <br />Department dims appropr� , �m u'. M.,edial action docun mts• This <br />taken for the remedial action and any imPscts due to remedy action. <br />r.. z C lie ajlrp128}l Admi24<�iVe Action. <br />2.rlms . <br />The departmeru shall ensure compliance with the substantive r0quirem nts of permit iaws <br />through a consent decree, order or agreed order issued undo the Model nqu Control <br />Act, or during the department -conducted remedial action. The substantivea requirtxnents <br />shall to k=wP°rated into appropriate remedial action documents such as the remedial <br />investigation and feasibility study, the interim action workplan or proposed Ceanup action <br />plan- Any time an order or decree is issued, the project manager must determine if the <br />remedial actions required under the order or decree require a permit- 1f so, the order or <br />decree must include the known substantive requirements for those permits. The order or <br />Site Management <br />4-13 March 16, 1995 <br />