My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2731 FEDERAL AVE 2018-01-02 MF Import
>
Address Records
>
FEDERAL AVE
>
2731
>
2731 FEDERAL AVE 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/4/2022 10:42:40 AM
Creation date
2/10/2017 3:33:46 PM
Metadata
Fields
Template:
Address Document
Street Name
FEDERAL AVE
Street Number
2731
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
145
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RZARITTENNOUSE-ZEMAN & ASSOCIATES, INC. <br />Geoteehnkal & Environmental Consultants <br />1400 140th Avenue N.E. <br />Bellevue, Washington 98005-4594 <br />MIAMI (206) 746-80201FAX (206) 746-63644� <br />20 January 1991 / /� )� W-4558-3 <br />City of Everett 2 Iqo D <br />Department of Public Works <br />3200 Cedar Street 466` W FRF ••... <br />Everett, Washington 98201 mat <br />Attention: Mr. Kirk Brooks <br />Subject: Street Use Permit for Offsite Subsurface Exploration <br />Mobile Oil Corporation <br />Site No. 46-108 <br />Everett Bulk Plant <br />2731 Federal Avenue <br />Everett, Washington <br />Mr. Brooks: <br />Enclosed are copies of the monitoring well and well monument construction details and <br />traffic control plan for construction of borings and monitoring wells in Federal Avenue. <br />The locations of the proposed borings are also shown on the traffic control plan. The <br />purpose of the borings is to collect soil and groundwater samples for analytical <br />laboratory testing as part of a subsurface environmental assessment. <br />We anticipate the installation of the borings and monitoring wells will require 4 to 8 hours, <br />including well monument installation. The borings will be located approximately 2 feet <br />from the western edge of the gravel shou:dei on the east side of the street. We estimate <br />an additional 48 hours will be required for the concrete surrounding the well monuments <br />to cure sufficiently to allow exposure to traffic. Flashing traffic barricades would be set <br />up to protect the well monuments while the concrete cures. We would like to begin <br />construction as soon as possible. <br />
The URL can be used to link to this page
Your browser does not support the video tag.