Laserfiche WebLink
Jeff Heilman <br />From: Jeff Heilman <br />Sent: Monday, May 06, 2013 8:05 AM <br />To: 'Bill Rohwer' <br />Subject: RE: Construction permit status for 3002 Federal <br />I will approve the plans and include this email in thc permit package and pass it on to the p�rniit technicians to <br />process the permit. I cannot speak to the time to issuc thc pennit, since 1 do not process the actual permit. <br />)eff Heilman <br />Development Technician <br />City of Everett <br />Engineering/ Public Services Division <br />3200 Cedar Street, Everett WA 98201 <br />Phone 425-257-8976 <br />Fax 425-257-8857 <br />From: Bill Rohwer [mailto:wdr1626 yahoo.com] <br />Sent: Sunday, May O5, 2013 9:14 PM <br />To: Jeff Heilman <br />Subject: Re: Construction permit status for 3002 Federel <br />Hi Jeff, <br />Thanks for calling me back on Friday after talking with the mechanical guy. <br />So I went over to the house today and the furnace is a 65,000 BTU Homart. So based on that I <br />believe that the combustion air calculation is as follows: <br />The unfinished basement area not including the bedroom addition and the laundry room addition is <br />2 rectangles with the following dimensions <br />17'x12'x8=1632cuft.&15'x20'x8=�.400cuft.foratotalof4032cuft. <br />Total BTUH is 65MBH. So 4032 cu ft / 65MBH = 62.03 cu ft. of combustion air per 1000 BTU. <br />Please let me know if this satisfies what we discussed on Friday. Also, I will be leaving town on <br />business on this coming Wednesday and will be gone thru the weekend. If there is any way I could <br />come in and get the permit before Wednesday I would really appreciate it, that way my brother, and <br />co owner, could get started over the wE '=nd. <br />Thank You! <br />Bill Rohwer <br />425 308-7764 <br />