Laserfiche WebLink
GLAZING -SCHEDULE <br />GLAZING % _ TOTAL 1�� <br />(OrMN/V <br />AVG. U-VALUE _ UA TOTAL = TOTAL 2 = <br />790TaiAL O A <br />INSTRUCTIONS FOR COMPLETING THE GLAZING SCHEDULE <br />IF ALL OF YOUR GLAZING IS NFRC CERTIFIED AND LABELED: <br />TOTAL 1 TOTAL 2 <br />Complete column, 181. ICI. (H). (1) and the GLAZING % calculation. <br />IF ANY OF YOUR GLAZING IS NOT NFRC CERTIFIED AND MANUFACTURED BY A SMALL BUSINESS OR IF YOUR GLAZING IS SITE BUILT: <br />Complete column, (A) through III and the GLAZING % calculation. , <br />Use U-Value, contained in WSEC Table 10-68 in column (HI for non -tested manufactured glazing. <br />Use U-Value, contained in WSEC Table10-6A in column (H1 for site built or custom glazing. <br />If any U-values exceed your comp:ience path in Table 6.1 or 6-2. you will also be required to complete column (JI andthe AVG, U•VALUE calculation. <br />The average U-value cannot exceed those in Table 6.1 or G.Z. 7/21/15 ' <br />