Laserfiche WebLink
Date I -`? _7 <br />Application For <br />PUBLIC WORKS PERMIT <br />Print or Type Only <br />Mailing Address <br />Pubhn WolkS Permit <br />Bldg. Dept, s <br />Public Works Fee <br />Total Fee $ — <br />Less APPI. Fee Pail $ <br />Balance Due $ <br />Phone <br />Applicant Mailing Address City Zip Phone <br />DesFribe Proposed Work <br />5, a_" in — <br />Project Address (if known) <br />be_ <br />Attach four (4) copies of plans for proposed work - Draw to scale and note the following as applicable: <br />• Property Lines <br />• Outline and dimensions of all existing and <br />proposed structures on the lot <br />• Existing and proposed utilities <br />• Centerline of street <br />• Indicate North <br />• Show any proposed grading changes <br />• Show measurements <br />PERMIT CONDITIONS <br />1. All calls for inspection shall be made 24 hrs. in advance- phone 259-8810. <br />2..All work shall be performed in accordance with this permit and current City of Everett Design and Construction <br />Standards and Specifications. <br />3. Call Location Underground Service 48 hrs. before yogi dig. TOLL FREE NUMBER 1-800-424-5555. <br />Approved for Construction <br />Date <br />FINAL INSPECTION Date <br />Approved as Constructed <br />i <br />PUBV'WORKS DEPARTMENT <br />Ever Cedar Street <br />Everett, WA 98201 <br />Phone: 259-8810 <br />cZ 5.�2 Yv.s <br />0 <br />l °`'° <br />i� 03 / <br />ACKNOWLEDGEMENT OF CONDITIONS <br />W <br />H <br />Im <br />O <br />z <br />O <br />H <br />O <br />a <br />The undersigned owner/applicant hereby agrees to hold and save harm- <br />less the City of Everett from any and all claims for damages, costs. <br />expenses, or causes of action that may arise because of installation <br />and maintenance of the improvement or other right-of-way use hereto <br />applied for and further agrees to remove same upon notice from the <br />City and to replace public property damaged thereby. <br />I <br />Signature of Applicant Date <br />WORK AUTHORIZED BY THIS PERMIT MUST BE STARTED WITHIN <br />180 DAYS OF DATE PERMIT IS ISSUED AND THEREAFTER IS TO <br />BE DILIGENTLY PURSUED TO COMPLE110N. THIS PERMIT MAY BE <br />CANCELLED BY THE CITY UPON ANY STOPPAGE OF WORK ON THIS <br />PROJECT OVER 90 DAYS DURATION. <br />