Laserfiche WebLink
❑ <br />❑ <br />e Thermal break(s),shall be placed In the slab (S. 502.i.4.6, 2U1 1 rt3UiLf)iNG ENVELOPE] <br />behveen the pndlgoned and unconditioned spaces checked below, and extend from the top of,: , <br />1 <br />< slab 10 the bottom, then undernealh toward the conditioned space for a 24"total developed dimens <br />O dweilmglgarage 0 dwetiing/connected space 0 slab edge and foundation wall <br />Ma <br />�� f <br />p <br />❑ <br />5 aifon mBlgatfon system (VIAQ, S. 5021) shall beinstalied if one of She following. is check <br />is less than 1 PT2 3f)0 Ft2 of crawl spa " <br />A. Net foundation ventilation area per <br />B. Foundation vents aiczlosaole. I _ <br />C. Under floor plenum acts as supply or return air duct <br />Foundation phase requirements:spected <br />CSEC <br />by: Date <br />4 MW q <br />P <br />All structural panels such as plywood, particle board, wafer board, and oriented strand board shall be <br />tabled" EXPOSURE 1" "EXTERIOR" or "HUD -APPROVED" (VIAQ, S.401.1). <br />Insulation baffles shall be placed in attics/ceilings to maintain at least 11 ventilation space and extend at <br />least 6" vertically above batts or 12" vertically above Ioosefill insulation (S. 502.1.4.5). <br />Glazing efllclency required underthe seleled tiara shall be,(S. 502.1.5, 602.7.2, Table 6-1): <br />I <br />Q s U;46 (Option 1) Q s U.43 (Options 11) S U.40 (Opfwn 111; IV) <br />Qs, Ui39 (Option;V) O s U.36(Option VI) (� s U.35 (Option VII) , Q s U 32 (Option V{il)y <br />k.w <br />Symbols used: = equals > greater than <less than z greater than or equal s less than or equal <br />UPDATED SEPTEMBER 1991 <br />Page 2 of 6 <br />