Laserfiche WebLink
PUBLIC 1(-IRKS PERMIT <br />City of Everett Public Works Department <br />3200 C1�ar Street OY-4iiiOlPfON) <br />Everette 98201 FEA <br />(425)257-8810 <br />FERNIT No.1007070 <br />Date: 8/6/2010 <br />Public(' arks Permit#: PW1008-012 <br />0y;u� Buildinq Permit#; B1007-070 <br />00lanninq Reference* <br />CT Public Works Fee $: $ 25.00 <br />Other $: <br />OWNER NAME AND ADDRESS: 1 DRIVE <br />APPLIrT.�,�AME AND ADDRESS: <br />c— ) W' <br />OVERSVEE JOHN A 1 S C <br />$4.50 <br />3434 FEDERAL AVENUE 0 <br />1007004 <br />i BUS. <br />$50.00 <br />EVERETT WA 98201 <br />1 S C <br />$4 50 i <br />PHONE: 4 <br />PHON!t;)9i,:9 <br />TAX PARCEL ID 0 C0437582901900 TLtL IT DD{ SS: 3434 FEDERAL AVE <br />DESCRIPTION OF PROPOSED WORK: CARD { <br />•NEW DETACHED GARAGE <br />PERMIT CONDITIONS <br />1. All calls for inspection shall be maue 24 hours in advance. <br />2. All work shall be performed in acco; dance with the permit and current City of Everett Design and Construction Standards <br />and Specifications. <br />3. Call Location Underground Service , I8 hrs before you dig. TOLL FREE NUMBER 811 I- <br />4. The contractor must meet with the !'lublic Works Inspector (call Randy Allen at 425-339-7403) to discuss potential <br />drainage routing prior to beginning t'te project. <br />5. Install erosion control measures as determined by the Public Works inspector, such as silt fence, straw bales. <br />swales, or erosion blankets. <br />6. Remove erosion control measures upon completion of the project prior to final app, oval of the permit. <br />7. No dirt, mud, rocks or debris to be tracked onto roadway. <br />8. No building materials to be stacked on sidewalk and sidewalk to be kept clean and open for pedestrian travel. <br />TO POSTING / <br />�o tru Date <br />/c-/-/o <br />ION Date <br />as <br />ACKNOWLEDGEMENT OF CONDITIONS <br />The undersigned owner/applicant hereby agrees to hold and <br />save harmless the City of Everett from any and all claims for <br />damages, costs, expenses, or causes of action that may arise <br />because of iZupono' <br />ntenance of the improvement <br />or other righapplied for and further agrees <br />to remove sm the City and to replace <br />public propey. <br />Date <br />WORK AUTHORIZED BY THIS PERMIT MUST BE STARTED WITHIN 180 DAYS OF DATE PERMIT IS ISSUED AND THEREAFTER IS TO BE DILIGENTLY <br />PURSUED TO COMPLETION. THIS PERMIT MAY BE CANCELLED BY THE CITY UPON ANY STOPPAGE OF WORK ON THIS PROJECT OVER 90 DAYS DURATION <br />