Laserfiche WebLink
Geologic Investigation and Geotechnical Fngineering Report <br />Jones Residence <br />3611 Federal Ave. <br />Everett, Washington <br />98-08-10 <br />backfilled with a minimum 18" or 5/8" minus washed pea gravel. Downspouts and yard drains should be <br />tied into their own minimum 4" diameter ADS drain line placed in such a manner as to allow for positive <br />flow of water through the drain line toward an appropriate point of discharge. Cleanouts should be <br />provided along all drain lines in locations that allow ease of maintenance and operations. <br />The site soils are not conducive to on -site storm water retention. Permeability of the underlying silts is not <br />high enough to provide adequate percolation of collected storm water. We recommend that collected storm <br />water be treated in the same manner as run-off has been controlled historically on the site. Collected storm <br />and drainage water should be discharge at an appropriate point on or immediately below the site in such a <br />manner so as to direct the water away from any site improvements and not to degrade slopes down gradient <br />of the site. Discharge should occur in a controlled manner so as to limit erosion potentials at the discharge <br />point. <br />4.10 Erosion Control Measures <br />Best Management Practices (BAV s), as outlined in the Washington State Department of Ecology's <br />Storm {Pater Management Manual for the Puget .Sound Basin should be applied during the construction <br />phase of this project. Erosion control measures should also comply with WSDOT Standard Specification <br />section 8-01, Erosion ('orttrol. Due to the proximity and steepness of the site slopes, filter fences and straw <br />bale filters should be placed along all construction limits at the set back limit to help control siltation off <br />site during construction. Grading of the construction site should be completed such that drainage within the <br />construction area flows through siltation fences and bioswale buffers Any identified surface drainage <br />pathways off of the site should be protected from run-off and siltation with filter fences, straw bales or <br />settling ponds. Permanent erosion control measures should be installed as soon as possible after the <br />completion of work in any one area. <br />15 . GES, Inc. <br />