Laserfiche WebLink
C,, C:) <br />City of Everett <br />Building Dhdolon <br />Area and Roe Calculations <br />For Structures Over 2500 S.F. <br />Plan Chock No. C. I Z' 6 <br />Main Floor SQ. FT. @ $75.20 / S.F. _ _ 6 I, Z� <br />Upper Floor 119 Z SA. FT. @ $75.20 / S.F. = i 9'j, 63 S <br />Lower Floor 575 SQ. FT. @ =75.20 / s.F. = t 43 ZLty <br />Garage 4s � SQ. FT. ® $21.60 / S.F. = $ <br />Deck SQ. FT. $14.90 / S.F. = $ <br />Other _SQ. FT. ® $&-LV/ S.F. = $ <br />Total conditioned Space 25 8Z. <br />Main Floor <br />Upper Floor <br />Lower Floor <br />4-L SQ.". <br />/35 SQ.FT. <br />C) O SQ.FT. <br />TOTAL S S 0 O - <br />Total S YL/ SQ.FT. 13 % <br />