Laserfiche WebLink
CLOSED CM WOR1C ORDERB REPDRT <br />Total Utility Maintenanc03/13/1995nt Syete� <br />------^-�=a� <br />Page 1 <br />Date Range :O1/09/1989 - 03/07/1995 <br />CM Work Order Range :1001091070001 - 8801086100085pa��ern ?*401196751126 <br />Item Range :<Blank> - F7P122020001 <br />.,_..,...�.� nr.r. Function ALL Activity ALL__ ____________________�_____ <br />---�--- - — ---- <br />___�_______����______________ <br />CM WORK ORDER ZD: 7401196751126 Title: <br />«DUPLICATE PRINTING OF THIS WORK ORDER» <br />Item ID: WS3095X005 -- WATER SERVICE <br />Location IDa Function 119 <br />Program 740 <br />Date Completed: 02/28/1995 <br />overall Craft: <br />Issued: 02/27/1995 <br />Out of Service? NO <br />Meter Readiny0 hours <br />Downtime: <br />Status: <br />Labor: <br />Craft ID____ <br />UL SSJ <br />WST W�'P <br />- Issued by: <br />Priority: <br />Name <br />SMITH, STEVE J• <br />WALDEN, DAROLD T. <br />Materiaiss <br />ID---------- <br />ADAP34000547 <br />BOX000056247 <br />COUP34004647 <br />COUP34135447 <br />ELIA34104247 <br />METE36069447 <br />NIpp36143947 <br />PIPE34060647 <br />VALV34008348 <br />CONVERT 3906 FEDERAL f�Vt- <br />Activity 675 <br />SKL Assigned to: <br />Travel Time: 0.00 Hr. <br />Planned Hrs <br />------ --------- - <br />0.00 <br />0.00 <br />Description _________ <br />ADAPTER 3/4" MIP X INSTA-TITE@ <br />BOX METER PLA 15" X 10" W/LID <br />COUPLING 3/4" ANG MET X��FIP @ <br />COUPLZNG 3/4" MIP X 1/2 CTSPJ@ <br />ELL 3/4" STREET4BRF+E�UNE T-10 <br />METER 5/8" X 3/ . <br />NIPPLE 1" X 6" BRASS <br />PIPE 3/4" POLY I.P.S. <br />VALVE 1QETER 3/4" IACK WING IP@ <br />vehicles: Description <br />ID -------- <br />-------------- <br />V2117 91 CHEV 1-TON HYC UNIT <br />Work Description:___________________ <br />METER# 39593999 <br />Actual Hrs <br />3.00 <br />3.00 <br />Total Labor Cost: <br />Date <br />02/28/1995 <br />02/28/1995 <br />02/28/1995 <br />py�y8/1995 <br />02/28/1995 <br />02/28/1995 <br />02/28/1995 <br />p2�28/1995 <br />02/28/1995 <br /># Used <br />-------2 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />2 <br />1 <br />Total Materiai Cost: <br />Hours <br />3.00 <br />Total Vehicle Cost: <br />Cost <br />16.80 <br />16.80 <br />Cost <br />45.09 <br />60.24 <br />105.33 <br />Cost <br />15.18 <br />12.27 <br />4.29 <br />1.08 <br />1.58 <br />26.14 <br />4.55 <br />0.48 <br />----- 8_07 <br />73.64 <br />• <br />