Laserfiche WebLink
INSPE�TION REPORT ,, <br />Address _ I � <br />Contractorsl `U � ' <br />Owner ��S�O'`'`�� <br />Date �O � °73 �-5 <br />�A�PROVA ❑ PARTIAL APPROVAL <br />❑ CORRECTION REQUESTED <br />7 Corrections listed below MUST BE MADE before work can be approved. <br />7 Please contact inspector and arrange for appointment. <br />0 Was not able to pertorm inspection. <br />LI CALL 259-8810 FOR REINSPECTION — 24 hour natice required <br />A CERTIFICATE OF OCCUPANCY SHHLL BE ISSUED AND POSTED <br />ON THE PREMISES PRiOR TO OCC4PANCY. <br />Inspector <br />TYPF OF INSPECTION REOUESTED � <br />U Temp. Elect. U Framing U Gas Piping <br />�� Footing ❑ Drywall, Nailing J Consultation <br />G dation U Shear Nading J Groundwork <br />❑ G�....�rk ❑ Grid ❑ Struct Slab <br />❑ Wood Stove iJ�Dough-in ❑ Final <br />0 Masonry ❑ Service ❑ Insulation <br />❑ Other_ <br />❑ BLDG Pmt. No. ❑ MECH: Pmt. Nc. <br />❑ ELEC: PmL No.---;; PLBG: Fmt. No. ���� <br />