Laserfiche WebLink
everett INSPECTjON REPORT <br />e Address <br />Contractor <br />Owner <br />Date <br />TYPE OF INSPECTION REQUESTE <br />❑ MECH: P <br />❑ BLDG: Pmt. No. — O PLBG: Pmt. No. <br />❑ ELEC: Pmt. No. — ❑ Gas Piping <br />❑ Framing ❑ Consultation <br />p Temp. Elect. ❑ Drywall, Nailing g6 roundwork <br />❑ Footing ❑Shear Nailing f7 Struct Slab <br />❑ Foundation p Grid ❑ Final <br />0 Ductwork �.,.,. �r ��— <br />❑ Wood Stove O g�ce <br />❑ Mason ❑ PARTIAL APPROVAL <br />APPROVAL ❑ CORRECTION REQUIRED <br />!'VIOLATIUN <br />e for aPPointment <br />❑ Corrections listed below MUST BE MADE before workcan <br />❑ Please contact inspectoroand inspection. <br />INSPEio I 24 hour notice required. <br />❑ Was not able to pe <br />o CALL 259-8810 FOR F1 AN INSPECTION — <br />ON <br />A CERTIFICATE <br />PREMISES PRIORU OCCUPANCYE ISSUED AND POSTED <br />THE <br />