Laserfiche WebLink
INSPECTION REPORT <br />Address <br />Contractor <br />Owner ,S/M <br />Date <br />J APPROVAL _j PARTIAL APPROVAL <br />VIOLATION _j CORRECTION REQUESTED <br />4 U Corrections listed below MUST BE MADE before work can be approved. <br />U Please contact inspector and arrange for appointment. <br />i ❑ Was not able to perform inspection. <br />❑ CALL 259-8810 FOR REINSPECTION — 24 hour notice required <br />A CERTIFICATE OF OCCUPANCY SHALL BE ISSUED AND POSTED <br />ON THE PREMISES PROM TO OCCUPANCY. <br />PO 91'.t <br />U Temp. <br />U Footing <br />❑ Foundation <br />❑ Ductwork <br />U Wood Stove <br />U Masonry <br />BLDG: Pmt. No. <br />i ELEC: Pmt. No. <br />a� <br />❑ Drywall, Nailing <br />J Shear Nailing <br />J Grid <br />J Rough -in <br />❑ Service <br />j Other — <br />_- Piping <br />0 Consultation <br />U Groundwork <br />❑ Struct. Slab <br />J Final <br />U Insulation <br />U MECH: Pmt. No. <br />U PLBG: Pmt. No. <br />INSPECTION REPORT <br />Address /c? O 6 olw4� <br />Contractor _ <br />1l=00 <br />Owner _ Sl}04 <br />to <br />►S APPROVAL J PARTIAL APPROVAL <br />J VIOLATION j CORRECTION REQUESTED <br />Corr ed below MUST BE MADE before work can be approved. <br />U Please contact inspector and arrange for appointment. <br />U Was not able to perform inspection. <br />J CALL 259-8810 FOR REINSPECTION — 24 hour notice required <br />A CERTIFICATE OF OCCUPANCY SHALL BE ISSUED AND POSTED <br />ON THE PREMISES PRIOR TO OCCUPANCY. <br />Date <br />❑ Temp. Elect. <br />U Framing <br />❑ Gas Piping <br />❑ Footing <br />❑ Drywall, Nailing <br />U Consultation <br />❑ Foundation <br />❑Shear Nailing <br />❑ Groundwork <br />U Ductwork <br />U Grid <br />Struct. Slab <br />U Wood Stove <br />❑ Rough -in <br />Final <br />❑ Masonry <br />❑ Service <br />J Ip12ion <br />U Other <br />_( Cam_ <br />BLDG: Pmt. No. O�q9� UMECH: Pmt. <br />No. <br />_ <br />J ELEC: Pmt. No. _ <br />❑ PLBG: Pmt. <br />No. ___ <br />