Laserfiche WebLink
E/YG/JY mum / PUBL/C SEWICE5 OEPA?Ti MY,T <br />February 11, 2008 <br />Seventh Day Adventist Church <br />4132 Federal Ave <br />Everett WA 98203 <br />RF: STATUS OF YOUR CITY OF EVERETT PERMIT <br />Job Address: 4132 Federal Ave <br />Permit: E0703-140 (Install paddle fans, other electrical work) <br />FILE Cn"„ <br />(Please reference both permit number and address when calling or writing) <br />This letter is to remind you that there has been no Final inspection of work under the referenced <br />permit. Please see tine enclosed inspection activity report. The Everett Building Code states that all <br />permits expire if the work authorized by the pennits is suspended or abandoned for a period of 180 <br />days after the work is commenced. After March 18, 2008, work under this permit will no longer be <br />authorized unless you: <br />1) Demonstrate continuing progress by requesting inspection of work that has occurred since your last <br />inspection, or <br />2) Request final inspections of the work that is completed, or <br />3) Submit a written request for a 180 day extension, detailing justifiable cause for extension. <br />You may schedule inspections through our inspection telephone line at 425 257-8881, or to discuss the <br />status of your permit file, please call me at (425) 257-7261 between 9 a.m. and 4 p.m., or contact me <br />by e-mail at mnncleod@ci.everett.wa.us. <br />Sincerely, <br />YV c La <br />Margaret McLeod <br />Building Division <br />cc: Wieco Electric <br />PO Box 598 <br />Granite Falls WA 98252 <br />CITY OF EVERETT • 3200 Cedar Street • Everett, WA 98201 • (425) 257-8800 • Fax (425) 257-8856 <br />