Laserfiche WebLink
TO ^�. .wine 6 <br />FROM Pub GWorks DSPL <br />DATE •ni �7, 19M <br />, r.�l/� SUBJECT TEp CHUM <br />CENTER <br />CITY OF EVERETT. EVERETT. WASHINGTOR <br />Public Mocks Department staff review of this proposal has been determined <br />that no off site drainage Improvements are required. Stormwater runoff shall <br />be conveyed to on-aite sanitary sewer after providing on -site detention. H <br />6" sewer is not adequate to handle runoff, a portion of the runoff may have to <br />be conveyed to a groundwater recharge system. <br />jcl <br />