Laserfiche WebLink
Date90 Public Works Permit a <br />Application For Bldg- Dept. s 24&E731 <br />PUBLIC WORKS PERMIT PtbTOtlicW Fee Fee s <br />Less Appi Fee Paid $ <br />Print or Type Only Sal anca Due $ <br />LurffER_ 0, fiz_A reg-E)e A0, Znx 2697 EvE,keFrT 98ZO3 .2Te-237/ <br />Owner Mailing Address City Zip Phone <br />[3oTeScH A14sH HgLt- 4206, HOY% AVE EvER TT- 982A3 2J9--o868 <br />Applicant Mailing Address City Zip Phone <br />Describe Proposed Work <br />Project Address (if known( <br />Attach four (4( copies of plans for proposed work - Draw to scale and note the following as applicable <br />• Property Lines <br />• Centerline of street <br />• Outline and dimensions of all existing and <br />• Indicate North <br />proposed structures on the lot <br />• Show any proposed grading changes <br />• Existing and proposed utilities <br />• Show measurements <br />PERMIT CONDITIONS <br />t. All calls for inspection shall be made 24 hrs. in advance - phone 259-8810. <br />2. All work shall be performed in accordance with this permit and current City of Everett Design and Construction <br />Standards and Specifications. <br />3. Call Location Underground Service 48 hrs. before you dig. TOLL FREE NUMBER 1.800-424.5555. <br />Approved for Construction Date <br />FINAL INSPECTION <br />Date <br />Approved as Constructed <br />everett PUBLIC WORKS DEPARTMENT <br />3200 Cedar Street <br />Everett, WA 98201 <br />-A <br />Phone: 259.8810 <br />CONTIi'G/ qet A h / n j . <br />ACKNOWLEDGEMENT OF CONDITIONS <br />0 <br />00) <br />0 <br />0 <br />a <br />The undersigned owner/applicant hereby agrees to hold and save harm- <br />less the City of Everett from any and all claims for damages, costs, <br />expenses, or causes of action that may arise because of installation <br />and maintenance of the improvement or other right-of-way use hereto <br />applied for and further agrees to remove same upon notice from the <br />City and to replace public property damaged thereby. <br />Signature of Applicant Date <br />WORK AUTHORIZED BY THIS PERMIT MUST BE STARTED WITHIN <br />180 DAYS OF DATE PERMIT IS ISSUED AND THEREAFTER IS TO <br />BE DILIGENTLY PURSUED TO COMPLETION. THIS PERMIT MAY BE <br />CANCELLED BY THE CITY UPON ANY STOPPAGE OF WORK ON THIS <br />PROJECT OVER 90 DAYS DURATION. <br />