Laserfiche WebLink
September 13, 1995 <br />f� LI SEP 15 1995 <br />CITY OF EVERETT <br />Public Works Dept. <br />Kirk Brooks <br />City of Everett <br />Public Works Department <br />3200 Cedar Street <br />Everett, WA 98201 <br />RE: LUTHER CHILD CARE ADDITIONAL PARKING, CITY OF EVERETT, WA <br />JCL #94-198-100 y <br />Dear Mr. Brooks: <br />From our phone conversation (9/13/95), we discussed and resolved the following three �O t <br />items: � <br />1, Connecting 24' diameter detention pipe directly into storm drain catch basins, �� r <br />eliminating 8" diameter pipes at either end. This should be done without extra �04 +&cr <br />expense to the owner. <br />2. Constructing lift gate at control structure per City of Everett specifications as shown <br />on plan. <br />3. Confirmation that a 48" diameter storm drain manhole at the downstream end of the <br />detention pipe will be adequate. <br />Sincerely, <br />ASSOCIATES, INC. <br />Joost eg <br />Proje gineer <br />JZ:cw <br />cc: Jean Costanti <br />File: 4198AL02. W PD <br />EngineeringlPlanning-2911 Bond Street, Suite 201. Everett, Washington 98201, (206) 259.60711Seattle 362-6884 <br />