Laserfiche WebLink
INSPECTION REPORT <br />Addres: <br />Contrac <br />�� (3wns� <br />Date � � � �� <br />❑ APPROVAL L�PARTIAL APPROVAL <br />C.I VIOLATION �CORRECTION RE�UESTED <br />x <br />O Corcections listed below MUST BE MADE before work can be approved. <br />O Please contact inspector and artange for eppointment. <br />❑ Was not able to per(orm inspeclion. <br />�ALL (425) 257-BB10 FOR REINSPECTION — 24 hour notice required <br />A CERTIFICATE OF OCCUPANCY SHALL BE ISSUED AND POSTED <br />ON THE PREMISES PRIOR TO OCCUPANCY <br />Inspector <br />— ��TYhE OF1 SPECTIQ": RE�UESTED <br />❑ Temp. lect. ��Taming ❑ Gas Pipin� <br />❑ Footing ❑ Drywalf Nailing U Consultahon <br />❑ Foundation U Shear Nailing ❑ Groundwork <br />❑ Ductwork ❑ Grid ❑ Struct. Slab <br />O Wood Stove U Rough-in 0 Final <br />❑ �'asonry U Service � ❑ Insulation <br />❑ Olher ���� <br />�BhGG: Pmt. No..��-- 0 MECH: Pmt. No. <br />❑ ELEC: Pmt. No. 0 PLBG: Pmt. No. <br />