Laserfiche WebLink
' r <br />3 <br />CLOSSD CM WORR ORDERS REPORT <br />Total Utility Maintenance Management System <br />11/19/1997 Page 1 <br />______�_________________________________________________________________________ <br />------ ----------------- ------------ <br />Date Range :O1/09/1989 - li/19/1997 <br />CM Work Order Range :1001091070001 - UT0200-01-01 Pattern :7101236710236 <br />Item Range :<Blank> - WVL3694L05 Pattern :* <br />Program ALL Function ALL Activity ALL <br />___�_____��__________________________________________________________ ____ ___ <br />CM WORK ORDER ID: 7101236710236 Title: INSTALL 5511 - FLEMMING STREET <br />«DUPLICATE PRINTING OF THIS WORK ORDER» <br />Item ID: -- <br />Location ID: -- <br />Program 710 Function 123 Activity 671 <br />Date Completed: 10/12/1997 <br />Overall Craft: <br />Iesued: 10/30/1997 <br />Out of Service? NO <br />Meter Reading: <br />Downtime: 0 hours <br />Status: HN <br />Labor: <br />Craft ID Name <br />Issued by: HDA Assigned to: AGA <br />Priority: Travel Time: 0.00 Hr. <br />----- ------ ------------------------------ <br />HEO AAL ARNOLD, ARTHUR L <br />UL GDJ GOSS, DANNY JAMES <br />SJP2 HDA HALLSSON, DONALD A. <br />EO MJL2 MITCHELL, JEFFREY L. <br />EO SDK STUART, DARRELL K. <br />Materials: <br />ID <br />BRIC00061156 <br />CEME00061438 <br />COUP46300347 <br />ELL044303447 <br />ELL044303547 <br />N/A <br />N/A <br />N/A <br />PIPE44304247 <br />TEE046304047 <br />Vehiclee: <br />ID <br />V2053 <br />V2113 <br />V2230 <br />V2231 <br />Description <br />BRICK CONCRETE 2" X 4" X 8" <br />CEMENT 20 MIN. SET 50 LB. BAG <br />COUPLING 8" Cl/PL X 8" Cl/PL <br />ELL 6" 45 DEG SP X GASKETED <br />ELL 6" 22 1/2 DEG ALL GASKETED <br />VEINED FRAME & GRATE (SALV D/P <br />2"X4"X8" RED BRICK (SALVAGE) <br />CB15 (ASSOC) <br />PIPL 6" PVC SEWER <br />TEE 8" X 6" ALL GASKETED <br />Description <br />------------------------------ <br />'86 CHEV 1/T PU <br />91 CHEV 1-TON <br />91 FORD F800 DUMP 5 YARD <br />90 FORD DUMP 5-YARD <br />Planned Hrs <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />Actual Hrs <br />9.50 <br />7.50 <br />1.00 <br />5.50 <br />2.00 <br />Coat <br />192.19 <br />105.98 <br />25.56 <br />107.69 <br />38.30 <br />Tctal Labor Cost: 469 71 <br />Date # Used Coat <br />-------- -------- ---------- <br />10/12/1997 13 3.51 <br />10/12/1997 2 23.68 <br />10/12/1997 2 21.64 <br />10/12/1997 1 4.76 <br />10/12/1997 1 5.18 <br />10/12/1997 1 0.00 <br />10/12/1997 12 0.00 <br />10/13/1997 3.72 <br />10/12 997 12 14.64 <br />10/12/1997 1 14.39 <br />Total Material Cost: 201.52 <br />I 1 7et <br />Hours Cost �'g� <br />1.00 4.80 <br />5.50 29.15 <br />5.50 59.40 <br />2.00 20.80 <br />