Laserfiche WebLink
*Pj19,GETA%S6N@U! x ID ENERGY <br />3130 S 38°i St <br />Tacoma, WA 98409 =cp <br />November 2, 2006 FnA <br />City of Everett DEC 6 2006 <br />Department of Public Works <br />3200 Cedar St. <br />Everett, WA 98201 <br />To Whom It May Concern: <br />1�11 �� IPuhlic Sorvitaa <br />r„p�nonrin0 <br />OD LE <br />OR 2 ZU06 U <br />OPERATIONS k WINTEN.9NCE <br />PSE Gas Corrosion Control Department to install a semi -deep anode well and solar CP <br />station for Cathodic Protection Maintenance in compliance with WUTC mandates, at <br />location of 405' N of C/L of 56th St & 15' E of C/L of Fleming St, and pole mounted <br />solar station to be installed at 405' N C/L of 56a' St & 23' E C/L of Fleming St, also test <br />wires to be installed on gas main in blacktop of street at 17' W C/L of Fleming St. Anode <br />well to be with depth of 60' and width of 10". The scope of this job was changed <br />pertaining to site location for the solar enclosure to proposed location of SW corner of <br />auto lot's fence per City of Everett, Kirk Brooks (inspector), to avoid conflicts with <br />homeowners. This job# 10660758 replaces job# 10652923. <br />Please view attached copies of drawing of the anode well to include the solar CP station. I <br />have also included a vicinity map, and a traffic control plan of the site. <br />If you have any questions with the permit information provided please contact me directly <br />at (253) 476-6311. If you have any questions regarding the actual job site or wish to talk <br />to the field technician please call Rick Kessler at (206) 571-7908. <br />Tha/nk you incerel <br />1. <br />John M McDivitt, Planner I <br />PSE, Gas Corrosion Control Department, Tacoma office <br />253-476-6311 (office), 253-405-5957 (cell), 253-291-4955 (pager) <br />email: john.mcdivittCpse.com <br />enclosures <br />Puget Sound Energy 3130 S 38" St, Tacoma, WA 98409 <br />