Laserfiche WebLink
January 22, 1341 <br />Paul ldiddleton <br />N,iddleton Painting <br />5609 Fleming Street <br />Everett, t4A 98203 <br />RE: l�eetin� ccnditions of Nonconforr�ina <br />granted on April 6, 1488, to operate a <br />establishment in a residential zone. <br />Dear Mr. Middleton: <br />L'se Permit r20, <br />comm�rcial <br />This letter is a follow up to our phvne conversation on <br />January 14, 1991. During that conversation, we discussed <br />problems you have encountered in making a good faith effort <br />to meet the conditions of your Nonconforming Use Permit. In <br />an effort to reach a solution, we explored a feasible <br />alternative a.> outlined below. <br />As you know, in order to satisfy the conditions of approval <br />of your Permit, it is necessary to provide a landscaping <br />"screen," including grass, along your street frontage as <br />well as paving and striping of the parking lot. Storm water <br />control will be a part of the parking lot design. <br />G � Gr <br />everett <br />..i : MM1.L . :E'J�6765 <br />!VCSr.TT.Y:ASNn.GIOY <br />FE7G1 <br />The problem has been in disposing of anticipated Storm water <br />runoff from the parking area. To date no easement access for <br />a storm water line from the site to the storm water trunk <br />line in Evergreen Way has been found, nor does it appear <br />that such easement will be forthcoming. Until a method of <br />disposal of the storm water is found, paving and landscaping <br />is not possible. <br />Tn light of the time that has elapsed in trying to obtain <br />easements and in fairness to nearby residents who have <br />legitimate expectations to see improvements made, the City <br />Engineer has determined that it may be possible for you to <br />provide a rain-water infiltration system. It is anticipated <br />this could be accomplished by a gravel filled infiltration <br />vault or similar means. <br />This new provision is contingent upon receipt of a favorable <br />soils and infiltration system design prepared by a licensed <br />engineer. The desi�r and accompanying calculations need to <br />show that tfire-soils.on site will provide adequate absorption <br />of a 25 year �torm event. <br />i <br />