Laserfiche WebLink
� y <br />q�� <br />YH� <br />H�� <br />'�tl �'�tl <br />N <br />Hy <br />x <br />o�° <br />O <br />c��o <br />t"y� <br />��p�p�pyyy t�i� y <br />�y <br />.:Hv�1i <br />HOm <br />�' <br />� <br />COYPLIANCE NWEC LOWRISE R�SIDENTIAL COMPLIANCE CHECKLIST <br />REOUIREDr El�ctrlcelly h�et�d dwNllnps, s 3 itorles, 2one 7, Western Washinpton <br />�,r <br />INBPECTION �MPORTANT: Pl�esa tupply Inform�tlon requssted In th� shadatl bo,c below. <br />APPROVED Dl�raperd toplci that don't cSascrlb� your bulldlnp or �qulpment. �QZ <br />pleea check� In th� two left columns. <br />� I I❑ I FOUNDATION PHASE: <br />S018� 0�I6�t8t1011(Chapter 8, Optbn III, or Chap 4 only): Glazing on the eide o(f the <br />home must tace within 45 deprees ot due aouth. No rtare than 60% of the glazing may Ile belween 31 to <br />71C <br />0�� <br />OIC' <br />0�❑� <br />�Choosa an A or B opt/on and bdow prade well Insu/at/on optlon: , <br />Redon MNipetlon slab requlremeMs wlll be addressed by: <br />❑ A. 4" course prade prave bese under alab Qurladictbn will o8er iree Radon monRorinp optbn) <br />OR <br />❑ B. Slab won't be poured over gravel base, Dwelling will be rtanRored for Radon when <br />completed. (DepaAment staM wlll provtde detailed raquirements ot this option) <br />Sleb Insulatlon wlll be ❑ R10 (Ch#6, all optfons) or ❑ R_(ChN4 or5): <br />❑ A. Exterior slab Insulation wlll extend downward to frostline or the slab bottom. . <br />OR <br />❑ B. Interlor slab Insulation will extend downward from the top slab suAace to Its undersurface <br />and horizontally under the slab lor a total dlstance of 24', or vertically 24". <br />Below Qrede meaonry wall Insulatlon will be: <br />� R10 (Ch N8, All optiona) on the exterior wall Instead of R19 interbr inaulatbn. See NWEC <br />OR FINAI PHASE REOUIREMENTS) <br />❑ F�(Chapter 4 or 5) <br />Thermal break(s) wlll be pleced In the slab betwsen the conditbned and uncondttbned spaces <br />checked below, and extend from the top o( ihe slab to the bottom, then underneath toward the <br />conditloned space for a 24" total devebped dlmension. <br />� ❑ dwellinglgarage ❑ dwelling/connec!ed space ❑ slab edga and (oundation wall. <br />❑ ❑ Exposed above•prade Insulatton prutected with stucco coating, or metal or plastic flashing. <br />❑ ❑ Vapor ratarder(c1 perm) required under the slab bocause course yrade gravel either is not installed or <br />lese than 2" thlck. <br />� � Insuletlon is approved for sub-grade, ex�erior use and properry Installed. <br />� <br />NWEC Foundaffon phase requlrementa: <br />Approved by: <br />Dete <br />WEEB APflll YO <br />Pege 3 of 7 <br />