My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5721 FLEMING ST 2016-01-01 MF Import
>
Address Records
>
FLEMING ST
>
5721
>
5721 FLEMING ST 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/10/2017 1:49:29 PM
Creation date
2/10/2017 5:16:10 PM
Metadata
Fields
Template:
Address Document
Street Name
FLEMING ST
Street Number
5721
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
58
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
IANCE NWEC LOWRISE RESIDENTIAL COMPLIANCE CHECKLIST <br />��o� Elactrlcelly haatad dw�llinps, s 3 storlas, Zona 1, West�rn Weshinpto <br />INBPECTION <br />APPHOVED IMPORTANT: Plaas� �upply loformatlon raquestad In ths approprlat� <br />shadad boxes balow. Dl�rapard boxoa that don�t descrlba your bulldlnp or <br />equlpment. DQ_N�tplacs chack� In the two left columns. <br />INSULAT/ON PHASE <br />❑ W�IIs(Includirp rim ',�sts) will be insulated wfthout compresebn to: <br />❑ R-19 batt ((:hli6, options I,III,I� ❑ R-24 (Ch #6,Optbn II) � R�Ch # 4 or 5) <br />❑ ❑ Balow prade walls not insulated on the exterbr (See FOUNDATION PHA E) will be inaulated to: <br />❑ R-19(Chapter 8, all Optbns) on the fnterbr O R-_ (Chapters 4, 5, or 7) on the Interior. <br />❑ ❑ Vaultad c�lllnps wlll be insulated wHhout compreasbn to: <br />❑ R38(Ch i6, all optbne) ❑ F�.(Ch #i4 or 5) <br />❑ I I O gky'Ia (R co'mmendatiom placenceelfng nsuletbn batt ,Intp a eQbehUd ekyl�ight'wells) <br />❑ Vapor retardera will be Installe� toward the wartn suAace as represerrted below: <br />Select one o tion for floors, walls, and appropriate ceilinps: <br />Floors: � Plywood tabeled EXPOSURE 1❑ Poly (2 4 MII) ❑ backed batls ❑ PVA <br />Wall�: ❑ Poly plastic (2 4 MII) ❑ backed batts ❑ PVA <br />Ceilings: ❑ Not requfred where ventilation space averages >72" above insulatlon. <br />�R'dK PW� ( 41+� ❑ back�d batts � PVA <br />❑ H�etlnp �y�tem etflciency and alzlnp requirements will be met as represeMed bebw• <br />Mexlmum heatiny system capacRv (150%of desipn heat load) has been calculated e� �• U KW <br />H�at Pump afticlency will be met underthe followinp compliance path: <br />❑ Ch #6, Option IV: air source heat pump: HSPF 2 6.8 <br />❑ Ch #5 air source heat pump: HSPF 2 6.8, COP i 2.7/2.0 <br />❑ Ch #5 water source heat pump: COPZ 3.0 <br />Heatlnp system requlroments wlll Is m�t with followlnp system: <br />M1r. Modal N Max. output K. W <br />Typ• HSPF COP <br />NWEC Insulallor. phase requlrementa: <br />Approved by: <br />Dete <br />WEEB IIPRIL YO <br />Page 8 of 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.