Laserfiche WebLink
CLOSED CK WORK ORDERS REPORT <br />Total Utility Maintenance Management System <br />______------ 12/23/1996 <br />uaue Kange :ol/09/1989 - 12/12/1996-----______- <br />CM Work Order Range :1001091070001 Item Range :<Blank> - WW22020001 - UT2600-02- <br />Program -ALL <br />----Function ALL Activity ALL <br />nv - <br />Pattern :7101196649203 <br />Pattern : * <br />ten.. vAULt ID: 7101196649203 Title: SO 1 INCH 5811 FLEMING ST <br />Item ID: <br />Location ID: (AB) <br />Program 710 Function 119 <br />Date Completed: 12/02/1996 Activity 664 <br />Overall Craft: <br />Issued: il/26/1996 <br />Out of Service? NO <br />Meter Reading: <br />Downtime: 0 hours <br />Status: <br />Issued by; Assigned to: <br />Priority: Travel Time: <br />0.00 Hr. <br />Labor: <br />Craft <br />ID <br />Name <br />----- <br />----- <br />----------- <br />Planned Hrs <br />WST <br />UL <br />AGE <br />------ <br />ALLEN, GARY E. <br />---------------- <br />SUP2 <br />CJE <br />GJ <br />CASE, JAMES E. <br />0.00 <br />UL <br />SWU <br />GARZA, JOHN (NMI) <br />0.00 <br />STENSETH, WOB URT <br />0.00 <br />0.00 <br />Materials: <br />ID Description <br />---------- ____________ <br />ADAP36001047 ADAPTER 1" CST X INSTA-TITE @ <br />ADAP36001247 ADAPTER 1" MIP X INSTA-TITE @ <br />BOXO00056047 BOX METER PLA 13" X 20" W/LID <br />CORP36002347 CORP STOP 1" CCT X COP COUP36006647 COUPLING 1" 1/8 BEND COPPER @ <br />METE36089247 METER 1" NEPTUNE T-10 @ N/A TRACING WIRE <br />PIPE36060747 PIPE 1" POLY I.P.S. <br />SADD46018447 SERVICE SADDLE 8" W/1" CCT <br />SETT36033547 SETTER COP 1" <br />(H15") <br />Vehicles: <br />ID <br />----- ------- <br />Description <br />V0017 <br />V2150 <br />--- <br />94 <br />---- <br />FORD <br />------- - - ---- <br />AEROSTAR VAN---------- <br />V2226 <br />87 <br />FORD <br />2 TON W/CRANE <br />V3505 <br />88 <br />FORD <br />DUMP 5 YARD <br />82 <br />CASE <br />BACKHOE <br />Actual Hrs <br />1.00 <br />1.00 <br />1.00 <br />1.00 <br />Total Labor Cost: <br />Page 1 <br />Cost <br />20.74 <br />15.31 <br />25.09 <br />15.45 <br />76.59 <br />- Date-- # <br />- <br />Used <br />----- <br />Cost <br />12/02/1996 <br />i <br />---------- <br />12/02/1996 <br />1 <br />1. <br />12/02/1996 <br />1 <br />1 90 <br />12/02/1996 <br />1 <br />2.56 <br />.95 <br />12/02/1996 <br />1 <br />12 <br />.36 <br />12/02/1996 <br />12/02/1996 <br />17 <br />8 2.79 <br />12/02/1 6 <br />17 <br />3 87 <br />12/02/1996 <br />1 <br />663 <br />.87 <br />12/02/1996 <br />1 <br />. <br />93 <br />3.38 <br />Total Material <br />Cost: <br />266.37 <br />Hours <br />---Cost <br />1 00 <br />6.00 <br />1.00 5.40 <br />1.00 11.00 <br />1.00 18.90 <br />Total Vehicle Cost: 41.30 <br />