Laserfiche WebLink
S <br />CLOSED CM WORK ORDERS REPORT g7il Sods <br />Total Utility Maintenance Management System Page 1 <br />11/19/1997 g <br />Date Range 01/09/1989 - 11/18/1997 <br />CM Work Order Range :1001091070001 - UT0200-01-01 Pattern 7101196730250 <br />Item Range :<Blank> - WVL3694L05 <br />Program ALL Function ALL Activity ALL <br />CM WORK ORDER ID: 7101196730250 Title: TAP 5905 FLEMING ST <br /><<DUPLICATE PRINTING OF THIS WORK ORDER>> <br />Item ID: WML0685L03 -- WATER MAIN LINE <br />Location ID: -- Activity 673 <br />Program 710 Function 119 Y <br />Date Completed: 10/1c:/1997 <br />Overall Craft: <br />Issued: 09/08/1997 <br />Out of Service? NO <br />Meter Reading: <br />Downtime: 0 hours <br />Status: <br />Labor: <br />Craft ID Name <br />Issued by: GJ Assigned to: AGE <br />Priority: Travel Time: 0.00 Hr. <br />----- -------------------------- --------- <br />WST BBA BRADLEY, BROCK A. <br />SUP2 GJ GARZA, JOHN (NMI) <br />DL MTL2 MARKHAM, TIMOTHY L. <br />Planned Hrs Actual Hrs <br />-------0.00----------- <br />0.00 1.00 <br />0.00 2.00 <br />Total Labor Cost: <br />Materials: <br />Description <br />Date <br /># Used <br />ID <br />BOXO00043347 <br />BOX VALVE 1811TOP 24"BOTTOM CI <br />10/15/1997 <br />10/15/1997 <br />1 <br />1 <br />COUP38007347 <br />COUPLING COMP 2" MIP X CTS @ <br />CLOSE BRASS <br />10/15/1997 <br />1 <br />NIPP38133847 <br />SADD44017247 <br />NIPPLE 2" X <br />SERVICE SADDLE 6" W/2" IP DEL <br />10/15/1997 <br />1 <br />VALV38034348 <br />VALVE GATE 2" SUPER HEAVY DUTY <br />10/15/1997 <br />1 <br />Total Material Cost: <br />Vehicles: <br />Description <br />Hours <br />Cost <br />ID <br />------------ <br />V0017 <br />---------------- ---------- <br />94 FORD AEROSTAR VAN <br />.00 <br />2. 00 <br />0.20 <br />V2156 <br />89 DODGE 1 TON <br />----- <br />_0 <br />Total Vehicle Cost: <br />16.00 <br />Cost <br />38.30 <br />25.85 <br />19.00 <br />83.15 <br />Cost <br />------ <br />32.35 <br />22.02 <br />3.27 <br />23.03 <br />96.75 <br />Work Description:-------- <br />------------------------------------------ <br />2" TAP AND FINAL CONNECTION <br />COST ESTIMATE DONE <br />