Laserfiche WebLink
�r <br />Deeember 13, 1996 <br />Rick Lyons <br />D.B. Johnson Construction, Inc. <br />1801 Grove St., Unit B <br />Marysville, WA 98270 <br />RE: Plan 1283, Floor Joist Construction <br />JCL #96-029-100 <br />Dear Mr. Lyons: <br />At Steve Massing's request, we checked the requirement for the second- ::: ry floor joist with a 12 <br />foot span and a 2 foot cantilever at the front of the residence. Per the atta.;hed calculation, 2 x 8 <br />No. 1 & btr joists at 16" on center may be used. A triple 2 x 8 joist should be used under the 5 <br />foot max window openings. <br />Should you have any questions, please call. <br />Sincerely, <br />JOHNSON COASTLINE ASSOCIATES, INC. <br />t ,J <br />Michael G. Wray, P.E., S.E. <br />Area Manager <br />MGW:cw <br />File: 6029ALOi.WPD <br />EngineedWIPlanning-2911 Bond Street, Suite 201, Everett, Weshington 98201 <br />(206) 259-6071, Fax (206) 259-1359, E-Mail JCLASOC@AOLCOM <br />An Equal OppWurliry Employer <br />