Laserfiche WebLink
everett <br />e <br />k� `� <br />� .,, yy, <br />INSPECTION REPORT <br />Address ��Q� �IGliw v�� <br />Contractor ��e-✓�'� <br />Owner <br />Date l �� g <br />TYPE� 7OF qINS�ECTION REQUESTED <br />�LDG: PmL No. I 1 S ❑ MECH: Pm�. No. _ <br />❑ ELEC: Pmt. No. <br />❑ Temp. Elect. <br />❑ Footing <br />❑ Foundation <br />_; ❑ Duciwork <br />❑ Wood Stove <br />:, ;C <br />, �- <br />:; ' <br />❑ PLBG: Pmt. No. <br />❑ Masonry ❑ Consultation <br />❑ Framing ❑ Groundwork <br />�rywall, Nailing ❑ Struct. Slab <br />❑ Rough•kr-- Fin I <br />❑ Service � �c <br />❑ Gas Piping �„a, , ,_ <br />�a4PPROVAL � I,�Z`� ❑ PARTIAL APPROVAL <br />❑ VIOLATION ❑ CORRECTION REQUIRED <br />❑ Corrections listed below MUST BE MADE be: �re work can be approved. <br />. ❑ Please contact inspector and arrange for appointment. <br />❑ Was not able to perform inspection. <br />G CALL 259-8745 FOP. REINSPECTIOM — 24 hour notice required. <br />A CERTIFICATE OF OCCUPANCY SHALL BE ISSUED AND POSTED ON <br />THE PREMISES PRIOR TO OCCUPANCY. <br />