Laserfiche WebLink
{,��>�� � �� '• 1 . 4� � � ��. . e <br />�T � F}' Et�. � �' -t I �. .` ;. <br />� �� ! <br />.I <br />/ <br />:.::�, ,=��Fi`ll%% � <br />Summary <br />6015 FLEMING ST <br />Co7t1-001 Isausd: <br />PW0777-0OB Issuad: <br />U0711-029 Isswd: <br />WDE01-005 Issusd: <br />EOl03-004 Issusd: <br />U0902-001 Issusd: <br />InsnectionTvoe <br />6015 FLEMING ST <br />t7/26/07 Shtus: <br />77/2fi�07 Statua: <br />t1/26J07 Shtus: <br />Status: ACTIVE <br />3/3I08 Statua: FINALED <br />2I5/09 Shtus: FINALED <br />Date Result <br />Ezplros:l0/2fl�09 NEW HOUSE <br />Expins:ll/70/09 NEW HOUSE <br />Expim:5/24/OB NEW SEWER CONNECTION (SEE U091 <br />Expins: CUT DOWN NEIOHBOH'S TREE <br />Explros:l0/18I09 WIRE NEW HOUSE <br />Explros: NEW 3l4' SERVICE FOR NEW HUUSE <br />Remarks <br />pertnit: C0711-001 Status: Isaued: 11/26/07 Finaled: To Records: <br />Description: NEW HOUSE <br />NoteslConditions: 2Ao6 zac, wsEc6 Wsvi�qc <br />UFER Ground 72/17/07 Approval Contractorwill install UFER bar <br />Footing 12/17/07 Approval <br />Foundation 1/3/08 Corr Reqd <br />Foundation wall inspected: <br />ConVactor verified setbacks <br />See notes <br />Corrections: <br />1. Not enough (toe) footing for foundation wall-front entry area- (bay windows) <br />2. Install foundation vents <br />Foundation 1!4/08 Corr Reqd See notes — REINSP REE REQ'D <br />Corrections: <br />Need to install rebar (doweling) into existing footings to tie in to additional footings (toe) every 18" into <br />existing. <br />•' Returned to site at 11:30, "Not Ready" need reinspection fee. <br />Bidg Other 1f7/OB <none> Reinspection fee paid <br />Footing <br />117/OB Approval <br />Foundation 1/7/OB Approval foundation wall-ok for concrete <br />Underfloor 1/22/08 PWppr-CorrReqc See notes <br />Corrections: <br />1. Install positive connection for 4" x 4" to concrete- note #6 sheet A08 per plans <br />Underfloor 7/24/OB Approval Ok to cover <br />ShearNailing 2/20/OB Approval As per plans <br />Note: Contractor will add a few more nails in some area to meet the shear nailing schedule as per <br />plans. 3" O.C. edges <br />GasPiping 3/19/08 Approval Gas pipe roughin-ok 15 psi <br />S:WIMcleod�CrystaNnspectionRecords.rpt 2/25/2011 Page 1 of 5 <br />