Laserfiche WebLink
InsoectionTvce <br />6015 FLEMING ST <br />Permit: C0711-001 Status: <br />Date Result Remarks <br />Issued: 11/26/07 Finat�d: To Rseords: <br />�escription: NEW HOUSE <br />Notes/Conditions: zao6zac, w5Ec6Wsvt�Qc <br />Counter Visit 4/28/09 Sce notes re building final inspection <br />Owner came to the counter to request permission to occupy the house prior finishing the driveway. <br />-Electrical, plumbing & mechanical finals have been approved. <br />-A building final is required to approve corrections. <br />-Owner is getting bids for driveway/sidewalk work. He plans to have it done in the next couple of <br />weeks. <br />-Since the owner will have to complete the site work to get final short plat approval (1202-35-07), Kirk <br />Brooks has approved the owner's request to occupy the house (after final building inspection approval) <br />and finish the driveway in 2 weeks. <br />Final Plbg 4/27/09 Approval As per notes <br />Final Plumbing approved as noted: <br />1. Complete 2nd wheel bollard at horivater tank <br />Final Bldg 4/28/09 Corr Reqd Doors lock�d-see notes <br />Corrections (visible ftom outside): <br />1. Stairvvay (outside) back of house needs to have hand railing installed and ends need to retum as <br />percode <br />2. Need access to Interior <br />Final Bldg 4/29/09 Corr Reqd See notes <br />Corrections: <br />1. Need to install weather stripping on front door <br />2. Need Certificate Letter for Insulation Installed <br />3. Need Safety glass in window next to patio slider door off master bedroom as per code <br />4. Need to install a ladder into crawl space over 4'-0" as per code <br />5. Need Public Works sign off for road/driveway <br />Final Bldg 5/1/09 PartialApproval See notes <br />Partial Approval for 2 weeks from today—Contractor will have completed remaining correction by <br />5-15-2009 Deadline <br />Corrections: <br />1. Need driveway paoed 8 Public Works signed off <br />2. Install safety glass next to window (bedroom) patio off bedroom upstairs <br />3. Provide a letter for insulation in floor <br />Final PW 5/1/09 PtAppr-CorrReqc OK to occupy-see requirements <br />Ok to occupy structure <br />Corcections: <br />1. Need to build driveway and install infiltration system <br />StatusReview 1/22/10 Send letter (see notes) <br />Status review: <br />No inspections called for since July O8. <br />House appears occupied. <br />Send final letter. <br />Letter <br />2/2110 <br />S:Vu1Mcleod�Crystal\InspectionRecords.rpt <br />Reminder to call for finals <br />2/25/2011 Page 3 of 5 <br />