Laserfiche WebLink
Si;e Address: <br />EIECTRICAL <br />❑ Temp Service <br />❑ Groundwork <br />❑ SIablConduit <br />❑ Rough In <br />❑ Service <br />LJ Grounding <br />❑ Ceiling Gr�d <br />lectrical Final <br />ITE WORK <br />❑ Footing drains <br />❑ Rool drams <br />INSPECTION REPORT <br />Date: 3 3 Pe�mit: �( SO ��� 79 <br />Contractor: �N/.�Y� G �AC� <br />Owner: � V�` S <br />TVPE OF IP <br />BUILDING <br />❑ UFER ground <br />❑ Foo�ing <br />❑ FounOation <br />❑ Slructural Slab <br />❑ Framing <br />❑ Insulation <br />❑ Drywall NaiLng <br />❑ Shear Nailing <br />❑ Roof Nailing <br />❑ Ceiling Grid <br />❑ Building Final <br />OTHER OR CONSULTATION: <br />MECHANICA� <br />❑ GroundworWSlab <br />❑ Rough In <br />❑ Ceiling Gnd <br />� OK to insulate <br />❑ Rooflop Units <br />❑ Mechanital Final <br />GAS PIPE <br />❑ Rough inlService <br />❑ Refngeralion <br />❑ Gas Pipe Final <br />PLUMBING <br />❑ Groundwork/Slab <br />❑ Rough In <br />❑ Cedmg Gntl <br />❑ OK to insulate <br />❑ Water Service <br />❑ Med�cal Gas <br />❑ Plumbing Final <br />Hot Waie� Tank <br />❑ Rouqh In <br />❑ HWT Final <br />,PPPROVAL ❑ PARTIALAPPROVAL FINALAPPROVAL <br />OKFORTGA ❑ CORRECTIONREOUESTED <br />OK FOR CD ❑ VIOLATION <br />UNABLETO PERFORMINSPECTION: <br />CALI (A25) 257•8881 FOR REINSPECTION • 24 hour notice required <br />� �.��� � ♦ „��� <br />+urun.evan <br />