Laserfiche WebLink
• CLOSED CM WORR ORDERS REPORT <br />, Total Utility Maintenance Management System <br />09/18/1997 Paqe 1 <br />___�_____=�===s=====______�_____________________�_______________________________ <br />Date Ranqe :12/03/1900 - 09/17/1997 <br />CM Work Order Range :1001091070001 - UT0021-35- Pattern :7101196751178 <br />Item Range :<Blank> - WVL3694L05 Pattern :* <br />Program ALL Function ALL Activity ALL <br />-------------------------------------------------------------------------- <br />r��----------------------------------------------------------------------- <br />CM WORK ORDER ID: 7101196751178 Title: REPAIR 6406 FLEMING <br />«DUPLICATE PRINTING OF THIS WORK ORDER» <br />Item ID: WS0685P048 -- WATER SERVICE <br />Location ID: - <br />Program 710 Function 119 Activity 675 <br />Date Completed: OS/28/1997 <br />Overall Craft: <br />Issued: 08/28/1997 <br />out of Service? No <br />Meter Reading: <br />Downtime: 0 hours <br />Stat•us : <br />Labor: <br />Craft ID <br />UL CSG <br />WST WDT <br />xatorials: <br />ID <br />ADAP34000447 <br />ADAP34000647 <br />BUSH34118547 <br />COUP36143547 <br />ELL036144047 <br />PIPE34060647 <br />REDU34136147 <br />Vehicles: <br />ID <br />V2'l17 <br />Issued by: WMW Assigned to: <br />Priority: Travel Time: 0.00 Hr. <br />Name <br />------------------------- <br />Cp,VANAH, SHANE G. <br />WALDEN, DAROLD T. <br />Description <br />------------------------------ <br />ADAPTER 3/4" IPS UNION INSTA @ <br />ADAPTER 3/4" FIP X INSTA-TITE@ <br />BU.SHING 1" X 3/4" BRASS � <br />COUPLING 1" CTN X 3/4" MIP @ <br />ELL 1" 90 DEG STREET BRASS ' <br />PIPE 3/4" POLY I.P.S. <br />REDUCER BELL 1" X 3/4" BRASS " <br />Description <br />91 CHEV 1-TON HYD UNIT <br />Planned Hrs Actual Hrs <br />----------- ---------- <br />0.00 2.00 <br />0.00 2.00 <br />Total Labor Cost: <br />Date <br />08/28/1997 <br />08/28/1997 <br />OS/28/1997 <br />OS/28/1997 <br />09/05/1997 <br />OS/28/1997 <br />08/28/1997 <br /># Used <br />1 <br />1 <br />1 <br />1 <br />1 <br />2 <br />1 <br />To+:al Material Cost: <br />Hours <br />2.00 <br />Total Venicle Cost: <br />Cost <br />10.60 <br />10.60 <br />Cost <br />28.26 <br />42.46 <br />70.72 <br />Cost <br />9.11 <br />7.65 <br />1.09 <br />4.82 <br />2.70 <br />0.40 <br />2.19 <br />-----27. 6 <br />Total cost for work order 7101196751178: 109.28 <br />