Laserfiche WebLink
p�x <br />ay5m <br />y x i-�i <br />� H� <br />�M. H'�l <br />fA N <br />H <br />xp <br />� HC <br />��g <br />(�] Y (i <br />xy H� <br />t i-+ H <br />gy <br />C] C7 y <br />��� <br />H O Cy/� <br />'M �� <br />Y ' <br />i � � <br />COMPLIANCE <br />pEOUIRED � <br />IN9PECilON IMPORTANT: Dtarepard topics thet don't descrite your bullding or equlpmeM. p0 NOT <br />APPpOVED p�ece c:�ecks In the iwo left columns. <br />O <br />O <br />0 <br />O <br />� <br />O <br />O <br />� <br />� <br />O <br />O <br />O <br />O <br />❑ <br />O <br />O <br />O <br />O <br />O <br />O <br />O <br />O <br />� <br />O O <br />O O <br />0 0 <br />O ❑ <br />. . •. <br />� AlNlow (rom habitable rooms to whole-house lan ensurod by und:rcut doors or grills (VIA�, S. 302.6.4) <br />O Loosetlll Insuiatlon OK H(S.502.1.4.5): <br />❑maximum ceiling slope s.3 In 12 <br />� 30" ot clear distance irom top oi boltom chord to underside of rool shealhing at the rooi ridge. <br />�� 6 mll black polyethylene ground cover, lapped 12" at Joinls and to Ioundation wall <br />Clearances shall meet Iisted minimums belween Insulalion and (S.502.1.4.3): <br />p chimney O Non•IC raled recessed Iighls:l/2" to combustables, 3" to insulation. <br />an4 Arilc hatch shall be insulated to required ceiling R-value and is weatherstripped (S.502.1.4.4) <br />��Attic eccess shall have wood dam or equivalent to retain loose fill insulation in aUic (S. 502.1.4.4) <br />� ji.11 exterlor doors (excepl 20 minule doors) shall be weatherslripped (S. 502.4.3). <br />� Service hot & cold water plping shall be (nsulated to R•3 (S. 503.11) <br />Servlce teclrculetlon hot water plping shall be insulated to Table 5-12 levels. <br />hermostat provided for each HVAC system wilh range oi 55-75' F.(heaUng) (S.503.8.1.1). <br />o Readlly accessible, automatic or Manual means provided to restrict or shut-oti Heating input to each <br />zone or floor d��ring periods not requiring heaE (S. 503.8.3.1). <br />t Controls for backup heai prohibit simillaneous operalion o( ihe primary syslem (S. 503.2.2(3)). <br />z Mechanlcal ventllatlon systems shall have proper timers, and/or swilches (S. 302.3). <br />a AAechanicel ventilatlon ducts shall have insulalion z R-4 in unconditioned spaces (VIAQ, S.302.5) <br />AAechenlcal supply ducts in condilioned spaces sliall have z R-4 insulation (VIAQ, S. 302.5) <br />s upply ducls shall have volume dampers, or ihe e�uivalent, to balance system (S. 503.6). <br />Supply end relurn aly ducls st.all have sealed duct joints in uncondilioned spaces (S. 503.10.2). <br />� HVAC plenums, supply, and return aly ducts shall have R-8 fnsulalion (Table 5-11, All oplfons) <br />Electric weter heater(s) shall have (S. 5042.1, 504.3, 504.4) : <br />p separate power shul-oil ❑ 1987 NAECA Lable on tank <br />❑ noncompressible R10 pad (unheated spaces only) ❑ Temperature setting s 120 F. <br />a Showe:s and lavatorles shall limit ilow+o s 3.0 galions/rninule (S. 504.8.1). <br />Swimming pool(s) (S. 504.5) shall have: . <br />�readily accessible ON/0FF swilch (pump, heater) ❑ Pool cover ❑ Piping Insulated to S. 503.11 <br />f Flreplace(s) (VIAQ, S. 402.3) shall have: <br />❑ 6 syuare inch combustion air supplyduct w! operahle damper, directly connected to Ihe iire box <br />O Tighl iitling glass or metal doors; or Ilue draft Inducifon fan. o Tighl fitting tlue damper. <br />z Solld tuel burning appliance(s) (VIAQ, S. 4022) shall have: <br />p Tighl fitting glass or metal doors <br />o Outside combusUon air source diredly connected to the ifre box <br />� Exceplfon: Non-direct, 4" diameter, dampered, combustion aIr source: allowed only for (1) new slove <br />Installations in existing homes where obslructions preclude direcl combustfon air, or (2) Central <br />healing systems located in unheated spaces. <br />I p I I O�J Three month, etched treck, radon monitor, prinled InstNctions, and an informalion sheet shall be <br />�='`�� I supplied by the buflder to each single family dwelling and to each ground Iloor unit of muRi-tamily dwellings <br />(VIAQ, S.5022.1). <br />WSEC Final phase requirements: <br />Inspected by: <br />Page 6 of 6 <br />