Laserfiche WebLink
a <br />� <br />0 <br />3 <br />CLOS&D CM 1PORR ORD8R8 RBPORT <br />Total Utility Maintenance Management Syatem <br />04/24/1998 Page 1 <br />eeexvvveexoevcosaa:=aevvo"==ccevevicesaaacoseevaxveo= <br />Date Range o01/09/1989 - 04/14/1998 <br />CM Work Order Range :0810800810001 - UT2830-30-322Pattern :7101196751413 <br />Item Range :<Blank> - WVL3694L05 Pattern :* <br />Program ALL Eunction ALL Activity ALL <br />xs_o=oo=e=oov=ee'==voe=oeee=e=v=eoo-ovev�s=mvaaassa�voavxa=ooeoxvessaoeeaoaaave= <br />CM WORK ORDER ID: 7101196751413 Title: REPAIR 6730 FLEMING <br />«DUPLICATE PRINTING OF THIS WORK ORDER» <br />Item ID: WS0685X013 -- WATER SERVICE <br />Location ID: -- <br />Program 710 Function 119 Activity 675 <br />Date Completed: 04/06/1998 <br />Overall Craft: <br />Iasued: 04/02/1998 <br />Out of Service7 NO <br />Meter Reading: <br />Downtime: 0 hours <br />Status: <br />Labor: <br />Craft ID <br />DLI CJM <br />UL CSG <br />EO KAE <br />HEO LDC <br />iJI, MF�A <br />EO MJE <br />DLI PCW <br />DLI SML <br />WST TllEl <br />UL WTE <br />Matarials: <br />ID <br />METE36089447 <br />RESE34146447 <br />Vehiclee: <br />ID <br />V2112 <br />V2117 <br />V2119 <br />V2225 <br />V3200 <br />V6401 <br />VJ0017 <br />Name <br />Issued by: WMW Aasigned to: <br />Priority: Travel Time: 0.00 Hr. <br />- ---------------------- <br />CHRISTIANSON, JEFFItEY M. <br />CAVANAH, SHANE G. <br />KARELSEN, ADOLPHUS E. IV <br />LITZ, DAVID C. <br />MAROON, HERBERT ARTHUR <br />MCNIVEN, JOHN E. JR. <br />PUGH, CAMERON W. <br />STRADLEY, MATT L. <br />THOMPSON, DWAYNE E. <br />WESTVANG, TERRY E. <br />Description <br />------------------------------ <br />METER 5/8" X 3/4" NEPTUNE T-10 <br />RESETiER 5/8" X 3/4" HEIGHT 9" <br />Description <br />---------------------- <br />91 CHEV 1 TON <br />91 CHEV 1-TON HYD UNIT <br />91 CHEV 5 YD <br />88 FORD BYD <br />80 CASE VIBROMAX W25 ROLLER <br />80 CASE FLATBED TRAILER <br />'96 FORD 5 YARD <br />Planned Hrs <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />Actual Hrs <br />i.00 <br />2.00 <br />1.00 <br />1.00 <br />1.00 <br />1.00 <br />1.00 <br />1.00 <br />6.00 <br />6.00 <br />Total Labor Cost: <br />Date <br />04/06/1998 <br />04/06/1998 <br /># Used <br />1 <br />1 <br />Total Material Coat: <br />Hours Cost <br />1.00 6.10 <br />2.00 10.40 <br />2.00 21.20 <br />1.00 15.34 <br />1.00 18.86 <br />1.00 0.00 <br />1.00 15.48 <br />Cost <br />9.00 <br />29.02 <br />19.66 <br />2'1.05 <br />15.24 <br />2U.09 <br />s� . 9�d <br />9.00 <br />123.72 <br />97.20 <br />352 98 <br />Coat <br />30.67 <br />47.75 <br />78.42 <br />