Laserfiche WebLink
sediment transport off the sire during construction, the following�eadaN^.,,:� ^,�•m;,,.be <br /> followed: <br /> 1) Coastruction should proceed during hz drier periods of the year. <br /> 2) Silt fencing should be placed along the lower elevarions of the cleaz�ed areas. <br /> 3) All storm water from nnpermeable surfaces, roadways, and roofs should be <br /> tightlined into detention/retendon facilities and not be direcUy dischazged into <br /> the adjacent drainage. <br /> 4) Surface runoff should be cor.trolled during and following development. Surface <br /> runoff must not be directed onto ur above the steeply sloping az:ss. All devices <br /> used ro collect surFace runoff should be directed into a dghdine �r swale system <br /> designed to convey the collected discharge into an approv-:d storm drain. <br /> Uncontrolled dischazge on the sloping azeas may pramote erosion and earth <br /> movement. <br /> 5) Soils which are to be reused azound the site should be stored in such a manner <br /> as to reduce erosion. Protective measures may include, but aze not necessarily <br /> limited to, covering with plasdc sheeting, the use of low stockpiles in flatter <br /> areas, or the use of hay bales/silt fences. Areas strit�ped of vegetation during <br /> construction shouid be replanted as soon as po�sible, or otherwise protected. <br /> Durin� �i�lt�constnc �nn_ 3ny bare slopes should be covered with clexr plastic <br /> to facilitate new growth. <br /> t � <br /> � �-� �� x�� ��� �� <br /> ; ��`� � '� ` "�� <br /> f <br /> J:": 4'J t(h.`�J{� 1 iit �1}A s����: <br /> y�. C � <br /> Ty���[���- T� ' { <br /> ..Z:A�3�. ..� <br /> 7 <br />