Laserfiche WebLink
FOR OFFICE USE ONLY <br />ADDRESS �- <br />(1) <br />BUILDING PERMIT FEE <br />(A) PLAN CHECK FEE <br />(2) <br />PLUMBING <br />(3) <br />MECHANICAL <br />(4) <br />STATE SURCHARGES <br />(A) BUILDING CODE <br />(B) ENERGY CODE <br />(5) <br />DRIVEWAY PERMIT <br />13 <br />(6) WATER SERVICE TO BE PAID PRIOR TO BUILDING PERMIT ISSUANCE NCH <br />(A) TO BE DETrRMINED BY BLDG. INSPECTOR <br />(B) EXIST. WATER SERVICE. APPLICATION NO. <br />(7) STATUS OF SEWER CHARGES: <br />BOND_ <br />DISTRICT -FOOTAGE N, S, E W <br />SYSTEMS DEVELOPMENT <br />WATER <br />SEWER <br />TOTAL ORD. FEE <br />SEWER CONNECTION CHARGES <br />YEAR TRUNK <br />LATERAL <br />TOTAL CONNECTION CHARGES <br />$ 3/4/ <br />H <br />SEWER PERMIT FEE $ 70 <br />